{"title":"2010年葡萄牙风电电网规范要求的技术和经济影响","authors":"J. Carvalhosa, José A. Barros, H. Leite, Adelino Barbosa, P. Pereira, P. Alves","doi":"10.1109/EPQU.2011.6128836","DOIUrl":null,"url":null,"abstract":"Both environmental and economic drivers have demanded for a higher penetration of wind power into the networks. In order to be more economically viable, wind power projects are urged to increase their scale. To overcome the technical challenges as a result of such increase, it became necessary for System Operators to modify Grid Codes to facilitate a securer wind power penetration into the networks. The Portuguese System Operators have recently (July 2010) adjusted their Grid Codes accordingly. This paper evaluates the technical and economic implications of such modification and conclusions are drawn accordingly.","PeriodicalId":369941,"journal":{"name":"11th International Conference on Electrical Power Quality and Utilisation","volume":"33 2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Technical and economic impacts of the 2010's grid code requirements for wind energy in Portugal\",\"authors\":\"J. Carvalhosa, José A. Barros, H. Leite, Adelino Barbosa, P. Pereira, P. Alves\",\"doi\":\"10.1109/EPQU.2011.6128836\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Both environmental and economic drivers have demanded for a higher penetration of wind power into the networks. In order to be more economically viable, wind power projects are urged to increase their scale. To overcome the technical challenges as a result of such increase, it became necessary for System Operators to modify Grid Codes to facilitate a securer wind power penetration into the networks. The Portuguese System Operators have recently (July 2010) adjusted their Grid Codes accordingly. This paper evaluates the technical and economic implications of such modification and conclusions are drawn accordingly.\",\"PeriodicalId\":369941,\"journal\":{\"name\":\"11th International Conference on Electrical Power Quality and Utilisation\",\"volume\":\"33 2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th International Conference on Electrical Power Quality and Utilisation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPQU.2011.6128836\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th International Conference on Electrical Power Quality and Utilisation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPQU.2011.6128836","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

环境和经济两方面的驱动因素都要求风电在电网中的渗透率更高。为了在经济上更可行,风力发电项目被敦促扩大规模。为了克服这种增长带来的技术挑战,系统运营商有必要修改电网代码,以促进更安全的风力发电进入电网。葡萄牙系统运营商最近(2010年7月)相应地调整了他们的网格代码。本文评价了这种修改的技术和经济影响,并据此得出结论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Technical and economic impacts of the 2010's grid code requirements for wind energy in Portugal
Both environmental and economic drivers have demanded for a higher penetration of wind power into the networks. In order to be more economically viable, wind power projects are urged to increase their scale. To overcome the technical challenges as a result of such increase, it became necessary for System Operators to modify Grid Codes to facilitate a securer wind power penetration into the networks. The Portuguese System Operators have recently (July 2010) adjusted their Grid Codes accordingly. This paper evaluates the technical and economic implications of such modification and conclusions are drawn accordingly.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信