某多功能建筑热电联产系统经济性研究

Kristóf Gyula Pap, P. Bihari
{"title":"某多功能建筑热电联产系统经济性研究","authors":"Kristóf Gyula Pap, P. Bihari","doi":"10.1109/IYCE45807.2019.8991562","DOIUrl":null,"url":null,"abstract":"Both consumer demand and network connectivity options determine what kind of energy system is required for a consumer. The construction of a decentralized energy system can have technical and economic reasons. It may be a technical reason that the consumer requires that are not available by connecting to a wired network. If a consumer decides to install his own power generating unit and becomes a “prosumer”, a preliminary technical and economic analysis of it is necessary. The design of the system, as well as the most optimal operating strategy for the system, must be determined during the technical examination. During my research, a simple unit cost analysis of a cogeneration system was performed. The aim of the research is to determine the costs of both electricity and heat production, and then to draw economic conclusions in comparison with the fixed tariffs. In the course of the examinations, I also discuss the role of the investment and operating costs of the unit costs. Possible economic planning principles are determined for combined heat and power gas engine unit.","PeriodicalId":226881,"journal":{"name":"2019 7th International Youth Conference on Energy (IYCE)","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Economic investigation of CHP system in a multifunctional building\",\"authors\":\"Kristóf Gyula Pap, P. Bihari\",\"doi\":\"10.1109/IYCE45807.2019.8991562\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Both consumer demand and network connectivity options determine what kind of energy system is required for a consumer. The construction of a decentralized energy system can have technical and economic reasons. It may be a technical reason that the consumer requires that are not available by connecting to a wired network. If a consumer decides to install his own power generating unit and becomes a “prosumer”, a preliminary technical and economic analysis of it is necessary. The design of the system, as well as the most optimal operating strategy for the system, must be determined during the technical examination. During my research, a simple unit cost analysis of a cogeneration system was performed. The aim of the research is to determine the costs of both electricity and heat production, and then to draw economic conclusions in comparison with the fixed tariffs. In the course of the examinations, I also discuss the role of the investment and operating costs of the unit costs. Possible economic planning principles are determined for combined heat and power gas engine unit.\",\"PeriodicalId\":226881,\"journal\":{\"name\":\"2019 7th International Youth Conference on Energy (IYCE)\",\"volume\":\"49 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 7th International Youth Conference on Energy (IYCE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IYCE45807.2019.8991562\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 7th International Youth Conference on Energy (IYCE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IYCE45807.2019.8991562","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

消费者需求和网络连接选项决定了消费者需要什么样的能源系统。分散式能源系统的建设有其技术和经济上的原因。这可能是由于技术原因,消费者需要连接到有线网络时无法使用。如果消费者决定安装自己的发电机组,成为“产消者”,则有必要对其进行初步的技术经济分析。系统的设计,以及系统的最优运行策略,必须在技术审查中确定。在我的研究中,对热电联产系统进行了简单的单位成本分析。这项研究的目的是确定电力和热能生产的成本,然后得出与固定电价相比的经济结论。在考试的过程中,我还讨论了单位成本的投资和运营成本的作用。确定了热电联产燃气机组可能的经济性规划原则。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Economic investigation of CHP system in a multifunctional building
Both consumer demand and network connectivity options determine what kind of energy system is required for a consumer. The construction of a decentralized energy system can have technical and economic reasons. It may be a technical reason that the consumer requires that are not available by connecting to a wired network. If a consumer decides to install his own power generating unit and becomes a “prosumer”, a preliminary technical and economic analysis of it is necessary. The design of the system, as well as the most optimal operating strategy for the system, must be determined during the technical examination. During my research, a simple unit cost analysis of a cogeneration system was performed. The aim of the research is to determine the costs of both electricity and heat production, and then to draw economic conclusions in comparison with the fixed tariffs. In the course of the examinations, I also discuss the role of the investment and operating costs of the unit costs. Possible economic planning principles are determined for combined heat and power gas engine unit.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信