考虑第三方应急力量的企业应急物资调度优化

Jihong Ye, Jiang Wei, Hong Bingyuan
{"title":"考虑第三方应急力量的企业应急物资调度优化","authors":"Jihong Ye, Jiang Wei, Hong Bingyuan","doi":"10.1117/12.2671925","DOIUrl":null,"url":null,"abstract":"The third-party emergency forces such as neighboring enterprises in the accident can improve the rescue efficiency and shorten the rescue time to ensure the production and property safety of the affected people as much as possible. This paper proposes an emergency material scheduling model taking time as the objective and considering the participation of multi-party emergency forces. The model can freely decide the type of materials to improve the rescue efficiency when the risk index of the accident point is satisfied. A real case illustrates the applicability of the proposed model. The result shows that the average arrival time of emergency supplies for corporate safety production accidents is 12.53 minutes, of which 89.13% of accidents can deliver supplies within 10 minutes. Daishan Fire Brigade and CNOOC (Zhoushan) are the main rescue partners for enterprises. In addition, foam trucks are given priority to be put into the rescue process. This study can provide a basis for enterprises to adjust the storage of materials and the government to supervise enterprises.","PeriodicalId":120866,"journal":{"name":"Artificial Intelligence and Big Data Forum","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimization of enterprise emergency material dispatch considering the third-party emergency force\",\"authors\":\"Jihong Ye, Jiang Wei, Hong Bingyuan\",\"doi\":\"10.1117/12.2671925\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The third-party emergency forces such as neighboring enterprises in the accident can improve the rescue efficiency and shorten the rescue time to ensure the production and property safety of the affected people as much as possible. This paper proposes an emergency material scheduling model taking time as the objective and considering the participation of multi-party emergency forces. The model can freely decide the type of materials to improve the rescue efficiency when the risk index of the accident point is satisfied. A real case illustrates the applicability of the proposed model. The result shows that the average arrival time of emergency supplies for corporate safety production accidents is 12.53 minutes, of which 89.13% of accidents can deliver supplies within 10 minutes. Daishan Fire Brigade and CNOOC (Zhoushan) are the main rescue partners for enterprises. In addition, foam trucks are given priority to be put into the rescue process. This study can provide a basis for enterprises to adjust the storage of materials and the government to supervise enterprises.\",\"PeriodicalId\":120866,\"journal\":{\"name\":\"Artificial Intelligence and Big Data Forum\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Artificial Intelligence and Big Data Forum\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1117/12.2671925\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Artificial Intelligence and Big Data Forum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.2671925","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

事故中的相邻企业等第三方应急力量可以提高救援效率,缩短救援时间,最大限度地保障受灾群众的生产和财产安全。提出了一种以时间为目标,考虑多方应急力量参与的应急物资调度模型。该模型可以在满足事故点风险指标的情况下,自由决定救援物资的种类,提高救援效率。一个实例说明了该模型的适用性。结果表明,企业安全生产事故应急物资平均到达时间为12.53分钟,其中89.13%的事故能在10分钟内送达物资。岱山消防队和中海油(舟山)是企业救援的主要合作伙伴。此外,泡沫车被优先投入救援过程。本研究可为企业调整物资储备和政府对企业进行监管提供依据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimization of enterprise emergency material dispatch considering the third-party emergency force
The third-party emergency forces such as neighboring enterprises in the accident can improve the rescue efficiency and shorten the rescue time to ensure the production and property safety of the affected people as much as possible. This paper proposes an emergency material scheduling model taking time as the objective and considering the participation of multi-party emergency forces. The model can freely decide the type of materials to improve the rescue efficiency when the risk index of the accident point is satisfied. A real case illustrates the applicability of the proposed model. The result shows that the average arrival time of emergency supplies for corporate safety production accidents is 12.53 minutes, of which 89.13% of accidents can deliver supplies within 10 minutes. Daishan Fire Brigade and CNOOC (Zhoushan) are the main rescue partners for enterprises. In addition, foam trucks are given priority to be put into the rescue process. This study can provide a basis for enterprises to adjust the storage of materials and the government to supervise enterprises.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信