修改离散预防性维护策略

T. Nakagawa
{"title":"修改离散预防性维护策略","authors":"T. Nakagawa","doi":"10.1002/NAV.3800330413","DOIUrl":null,"url":null,"abstract":"This article proposes a modified preventive maintenance (PM) policy which may be done only at scheduled times nT (n = 1,2, …): The PM is done at the next such time if and only if the total number of failures exceeds a specified number k. The optimal number k* to minimize the expected cost rate is discussed. Further, four alternative similar PM models are considered, when the system fails due to a certain number of faults, uses, shocks, and unit failures.","PeriodicalId":431817,"journal":{"name":"Naval Research Logistics Quarterly","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1986-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"17","resultStr":"{\"title\":\"Modified discrete preventive maintenance policies\",\"authors\":\"T. Nakagawa\",\"doi\":\"10.1002/NAV.3800330413\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article proposes a modified preventive maintenance (PM) policy which may be done only at scheduled times nT (n = 1,2, …): The PM is done at the next such time if and only if the total number of failures exceeds a specified number k. The optimal number k* to minimize the expected cost rate is discussed. Further, four alternative similar PM models are considered, when the system fails due to a certain number of faults, uses, shocks, and unit failures.\",\"PeriodicalId\":431817,\"journal\":{\"name\":\"Naval Research Logistics Quarterly\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1986-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"17\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Naval Research Logistics Quarterly\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/NAV.3800330413\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Naval Research Logistics Quarterly","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/NAV.3800330413","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 17

摘要

本文提出了一种改进的预防性维护(PM)策略,该策略只能在计划时间nT (n = 1,2,…)进行:当且仅当故障总数超过指定数量k时,在下一个这样的时间进行PM。讨论了使期望成本率最小的最优k*。此外,当系统由于一定数量的故障、使用、冲击和单元故障而失效时,考虑了四种类似的可选PM模型。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Modified discrete preventive maintenance policies
This article proposes a modified preventive maintenance (PM) policy which may be done only at scheduled times nT (n = 1,2, …): The PM is done at the next such time if and only if the total number of failures exceeds a specified number k. The optimal number k* to minimize the expected cost rate is discussed. Further, four alternative similar PM models are considered, when the system fails due to a certain number of faults, uses, shocks, and unit failures.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信