一种新的可再生能源发电到配电网整合的层次结构

Muhammad Umair Khan, Khan Wali, K. Karimov, M. A. Saeed
{"title":"一种新的可再生能源发电到配电网整合的层次结构","authors":"Muhammad Umair Khan, Khan Wali, K. Karimov, M. A. Saeed","doi":"10.1109/ICET.2015.7389187","DOIUrl":null,"url":null,"abstract":"This paper presents a new hierarchy about the study of renewable energy generation, its transmission, energy storage and adding this power to distribution grid level. Simulation are verifying the feasibility and working. The main purpose of this study is to propose a feasible solution to replace fossil fuel energy sources to renewable energy sources without changing current working distribution grids setup. This paper will describe main components of this hierarchy including DC-DC converters, DC transmission, energy storage devices and grid integration. DC-DC converters are converting generated voltages to high voltages to transmit them on DC transmission line. Similarly a DC-DC step down converter is being used for step down purpose for using transmission line voltage to low level voltage for energy storage purpose and for grid integration on distribution side. DC-AC inverter is using old distribution grid signal as sample and converter DC into AC according to it. Simulation results verify the efficient working of all converters and completely stable system.","PeriodicalId":166507,"journal":{"name":"2015 International Conference on Emerging Technologies (ICET)","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A new proposed hierarchy for renewable energy generation to distribution grid integration\",\"authors\":\"Muhammad Umair Khan, Khan Wali, K. Karimov, M. A. Saeed\",\"doi\":\"10.1109/ICET.2015.7389187\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a new hierarchy about the study of renewable energy generation, its transmission, energy storage and adding this power to distribution grid level. Simulation are verifying the feasibility and working. The main purpose of this study is to propose a feasible solution to replace fossil fuel energy sources to renewable energy sources without changing current working distribution grids setup. This paper will describe main components of this hierarchy including DC-DC converters, DC transmission, energy storage devices and grid integration. DC-DC converters are converting generated voltages to high voltages to transmit them on DC transmission line. Similarly a DC-DC step down converter is being used for step down purpose for using transmission line voltage to low level voltage for energy storage purpose and for grid integration on distribution side. DC-AC inverter is using old distribution grid signal as sample and converter DC into AC according to it. Simulation results verify the efficient working of all converters and completely stable system.\",\"PeriodicalId\":166507,\"journal\":{\"name\":\"2015 International Conference on Emerging Technologies (ICET)\",\"volume\":\"30 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Emerging Technologies (ICET)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICET.2015.7389187\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Emerging Technologies (ICET)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICET.2015.7389187","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文提出了一种新的可再生能源发电、输电、储能和并网研究的层次结构。仿真验证了该方法的可行性和有效性。本研究的主要目的是提出一种可行的解决方案,在不改变当前工作配电网设置的情况下,将化石燃料能源替换为可再生能源。本文将介绍该系统的主要组成部分,包括DC-DC变换器、直流传输、储能装置和电网集成。DC-DC变换器将产生的电压转换成高压,通过直流传输线传输。类似地,DC-DC降压变换器被用于降压目的,用于将传输线电压降至低电平电压,用于储能目的和配电侧的电网集成。直流-交流逆变器是以旧配电网信号为样本,将其转换为交流信号。仿真结果验证了各变流器的高效工作和系统的完全稳定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A new proposed hierarchy for renewable energy generation to distribution grid integration
This paper presents a new hierarchy about the study of renewable energy generation, its transmission, energy storage and adding this power to distribution grid level. Simulation are verifying the feasibility and working. The main purpose of this study is to propose a feasible solution to replace fossil fuel energy sources to renewable energy sources without changing current working distribution grids setup. This paper will describe main components of this hierarchy including DC-DC converters, DC transmission, energy storage devices and grid integration. DC-DC converters are converting generated voltages to high voltages to transmit them on DC transmission line. Similarly a DC-DC step down converter is being used for step down purpose for using transmission line voltage to low level voltage for energy storage purpose and for grid integration on distribution side. DC-AC inverter is using old distribution grid signal as sample and converter DC into AC according to it. Simulation results verify the efficient working of all converters and completely stable system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信