韩国能源独立岛屿项目实施环境案例研究

Chankook Park
{"title":"韩国能源独立岛屿项目实施环境案例研究","authors":"Chankook Park","doi":"10.12720/sgce.11.1.14-28","DOIUrl":null,"url":null,"abstract":"Efforts to build an energy-independent island (EII) have been made in island territories all over the world out of concerns for energy security and the environment. Likewise, EII projects on six islands have been proceeding in Korea since 2014. Korea’s EII projects are differentiated from those of other countries in that they have been implemented in a private investment-centric manner. However, it is said that the performance of EII projects over the past years has been inadequate. Hence, this study seeks to identify the problems of Korea’s EII projects and to suggest the directions for improvement. This study is primarily based on a literature review. We collected the literature from Science Direct, Google Scholar, and DBpia. In addition, this study draws on a number of other secondary sources. We have identified major challenges such as resolving business uncertainties, enhancing residents’ acceptance, and securing advanced microgrid technology. The most important issue for operators is the unit price of electricity per kWh because it is directly linked to profits, but until now it is not easy to accurately calculate it. Efforts to enhance the acceptance by local residents also needs to be pursued in a balanced manner. In order to ensure a stable supply of electricity through renewable energies, it is important to improve the technology for the microgrid system and to make distributed energy resources in the system be connected organically.","PeriodicalId":247617,"journal":{"name":"International Journal of Smart Grid and Clean Energy","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A case study on the implementation environment of Korea’s energy-independent island projects\",\"authors\":\"Chankook Park\",\"doi\":\"10.12720/sgce.11.1.14-28\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Efforts to build an energy-independent island (EII) have been made in island territories all over the world out of concerns for energy security and the environment. Likewise, EII projects on six islands have been proceeding in Korea since 2014. Korea’s EII projects are differentiated from those of other countries in that they have been implemented in a private investment-centric manner. However, it is said that the performance of EII projects over the past years has been inadequate. Hence, this study seeks to identify the problems of Korea’s EII projects and to suggest the directions for improvement. This study is primarily based on a literature review. We collected the literature from Science Direct, Google Scholar, and DBpia. In addition, this study draws on a number of other secondary sources. We have identified major challenges such as resolving business uncertainties, enhancing residents’ acceptance, and securing advanced microgrid technology. The most important issue for operators is the unit price of electricity per kWh because it is directly linked to profits, but until now it is not easy to accurately calculate it. Efforts to enhance the acceptance by local residents also needs to be pursued in a balanced manner. In order to ensure a stable supply of electricity through renewable energies, it is important to improve the technology for the microgrid system and to make distributed energy resources in the system be connected organically.\",\"PeriodicalId\":247617,\"journal\":{\"name\":\"International Journal of Smart Grid and Clean Energy\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Smart Grid and Clean Energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12720/sgce.11.1.14-28\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Smart Grid and Clean Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12720/sgce.11.1.14-28","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

出于对能源安全和环境的关切,世界各地的岛屿领土都在努力建立一个能源独立的岛屿。韩国也从2014年开始在6个岛屿进行EII项目。韩国的EII项目以民间投资为中心,与其他国家有所不同。然而,据说过去几年的环评项目表现欠佳。因此,本研究旨在找出韩国环境影响评价项目存在的问题,并提出改进方向。本研究主要基于文献综述。我们从Science Direct、b谷歌Scholar和DBpia收集了相关文献。此外,本研究还借鉴了其他一些二手资料。我们已经确定了解决业务不确定性、提高居民接受度和确保先进微电网技术等主要挑战。对于运营商来说,最重要的问题是每千瓦时的电价,因为它与利润直接相关,但到目前为止,准确计算它并不容易。提高当地居民接受度的努力也需要以平衡的方式进行。为了保证可再生能源稳定供电,必须对微电网系统进行技术改进,使系统中的分布式能源实现有机连接。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A case study on the implementation environment of Korea’s energy-independent island projects
Efforts to build an energy-independent island (EII) have been made in island territories all over the world out of concerns for energy security and the environment. Likewise, EII projects on six islands have been proceeding in Korea since 2014. Korea’s EII projects are differentiated from those of other countries in that they have been implemented in a private investment-centric manner. However, it is said that the performance of EII projects over the past years has been inadequate. Hence, this study seeks to identify the problems of Korea’s EII projects and to suggest the directions for improvement. This study is primarily based on a literature review. We collected the literature from Science Direct, Google Scholar, and DBpia. In addition, this study draws on a number of other secondary sources. We have identified major challenges such as resolving business uncertainties, enhancing residents’ acceptance, and securing advanced microgrid technology. The most important issue for operators is the unit price of electricity per kWh because it is directly linked to profits, but until now it is not easy to accurately calculate it. Efforts to enhance the acceptance by local residents also needs to be pursued in a balanced manner. In order to ensure a stable supply of electricity through renewable energies, it is important to improve the technology for the microgrid system and to make distributed energy resources in the system be connected organically.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信