{"title":"在健康和安全标准不确定的情况下,SWNT制造的生产成本建模","authors":"Z. Ok, J. Benneyan, J. Isaacs","doi":"10.1109/ISEE.2007.369372","DOIUrl":null,"url":null,"abstract":"A Monte Carlo cost model was developed to assess production costs of alternate manufacturing processes (HiPco, arc ablation, chemical vapor deposition) for single wall carbon nanotubes, given considerable uncertainty about occupational risk and future potential environmental health and safety (EHS) standards. Various assumptions regarding levels and implementation rates of EHA requirements were modeled as stochastic events and examined for their impact on the production cost expected values, variances, and probability distributions. Preliminary results suggest that in some cases voluntarily adopting higher standards than initially required can lead to lowest expected cost with the least uncertainty.","PeriodicalId":275164,"journal":{"name":"Proceedings of the 2007 IEEE International Symposium on Electronics and the Environment","volume":"753-755 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Modeling Production Costs for SWNT Manufacturing Given Uncertain Health and Safety Standards\",\"authors\":\"Z. Ok, J. Benneyan, J. Isaacs\",\"doi\":\"10.1109/ISEE.2007.369372\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A Monte Carlo cost model was developed to assess production costs of alternate manufacturing processes (HiPco, arc ablation, chemical vapor deposition) for single wall carbon nanotubes, given considerable uncertainty about occupational risk and future potential environmental health and safety (EHS) standards. Various assumptions regarding levels and implementation rates of EHA requirements were modeled as stochastic events and examined for their impact on the production cost expected values, variances, and probability distributions. Preliminary results suggest that in some cases voluntarily adopting higher standards than initially required can lead to lowest expected cost with the least uncertainty.\",\"PeriodicalId\":275164,\"journal\":{\"name\":\"Proceedings of the 2007 IEEE International Symposium on Electronics and the Environment\",\"volume\":\"753-755 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-05-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 2007 IEEE International Symposium on Electronics and the Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISEE.2007.369372\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2007 IEEE International Symposium on Electronics and the Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISEE.2007.369372","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Modeling Production Costs for SWNT Manufacturing Given Uncertain Health and Safety Standards
A Monte Carlo cost model was developed to assess production costs of alternate manufacturing processes (HiPco, arc ablation, chemical vapor deposition) for single wall carbon nanotubes, given considerable uncertainty about occupational risk and future potential environmental health and safety (EHS) standards. Various assumptions regarding levels and implementation rates of EHA requirements were modeled as stochastic events and examined for their impact on the production cost expected values, variances, and probability distributions. Preliminary results suggest that in some cases voluntarily adopting higher standards than initially required can lead to lowest expected cost with the least uncertainty.