为工业用电需求管理项目制定以性能为中心的维修策略

H. Groenewald, M. Kleingeld, J. Vosloo
{"title":"为工业用电需求管理项目制定以性能为中心的维修策略","authors":"H. Groenewald, M. Kleingeld, J. Vosloo","doi":"10.1109/ICUE.2015.7280246","DOIUrl":null,"url":null,"abstract":"Underperformance of industrial DSM projects is often caused by a lack of proper maintenance practices. This results in wasted electricity cost-savings opportunities and an increased demand for electricity on the national grid. A solution to the problem of underperforming industrial DSM projects is to apply a performance-centered maintenance (PCM) strategy. The various aspects of the PCM strategy are presented in this paper. It is based on the plan-do-check-act (PDCA) cycle for continuous improvement, which also forms part of the ISO 50001 energy management standard. Results show that the application of the PCM strategy could result in a performance increase of up to 70% when applied to underperforming industrial DSM projects. This proves the value of the PCM strategy to maximise and sustain the performance of industrial DSM projects.","PeriodicalId":251065,"journal":{"name":"2015 International Conference on the Industrial and Commercial Use of Energy (ICUE)","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"27","resultStr":"{\"title\":\"A performance-centred maintenance strategy for industrial DSM projects\",\"authors\":\"H. Groenewald, M. Kleingeld, J. Vosloo\",\"doi\":\"10.1109/ICUE.2015.7280246\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Underperformance of industrial DSM projects is often caused by a lack of proper maintenance practices. This results in wasted electricity cost-savings opportunities and an increased demand for electricity on the national grid. A solution to the problem of underperforming industrial DSM projects is to apply a performance-centered maintenance (PCM) strategy. The various aspects of the PCM strategy are presented in this paper. It is based on the plan-do-check-act (PDCA) cycle for continuous improvement, which also forms part of the ISO 50001 energy management standard. Results show that the application of the PCM strategy could result in a performance increase of up to 70% when applied to underperforming industrial DSM projects. This proves the value of the PCM strategy to maximise and sustain the performance of industrial DSM projects.\",\"PeriodicalId\":251065,\"journal\":{\"name\":\"2015 International Conference on the Industrial and Commercial Use of Energy (ICUE)\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"27\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on the Industrial and Commercial Use of Energy (ICUE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICUE.2015.7280246\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on the Industrial and Commercial Use of Energy (ICUE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICUE.2015.7280246","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 27

摘要

工业用电需求管理项目的表现不佳往往是由于缺乏适当的维护实践造成的。这就造成了电力浪费,节省了成本的机会,并增加了国家电网的电力需求。解决工业用电需求管理项目表现不佳问题的方法是应用以性能为中心的维护(PCM)策略。本文介绍了PCM策略的各个方面。它基于持续改进的计划-执行-检查-行动(PDCA)循环,这也是ISO 50001能源管理标准的一部分。结果表明,当应用于绩效不佳的工业DSM项目时,PCM策略的应用可使绩效提高高达70%。这证明了PCM策略在最大化和维持工业用电需求管理项目绩效方面的价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A performance-centred maintenance strategy for industrial DSM projects
Underperformance of industrial DSM projects is often caused by a lack of proper maintenance practices. This results in wasted electricity cost-savings opportunities and an increased demand for electricity on the national grid. A solution to the problem of underperforming industrial DSM projects is to apply a performance-centered maintenance (PCM) strategy. The various aspects of the PCM strategy are presented in this paper. It is based on the plan-do-check-act (PDCA) cycle for continuous improvement, which also forms part of the ISO 50001 energy management standard. Results show that the application of the PCM strategy could result in a performance increase of up to 70% when applied to underperforming industrial DSM projects. This proves the value of the PCM strategy to maximise and sustain the performance of industrial DSM projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信