{"title":"小型电力充液变压器的现场调试和维护","authors":"T. Nunn, D. Cherry","doi":"10.1109/PAPCON.2004.1338381","DOIUrl":null,"url":null,"abstract":"The purpose of this paper is to discuss some of the issues concerning proper receipt, handling and maintenance of small power liquid filled transformers. The paper reviews user technical considerations for transport, receiving and handling of small power transformers at an industrial manufacturing site. Best practices for installation, electrical terminations and field based testing are also reviewed. A list of recommended field and factory transformer tests along with expected test results is discussed.","PeriodicalId":189773,"journal":{"name":"Conference Record of 2004 Annual Pulp and Paper Industry Technical Conference (IEEE Cat. No.04CH37523)","volume":"65 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-10-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Field commissioning and maintenance of small power liquid filled transformers\",\"authors\":\"T. Nunn, D. Cherry\",\"doi\":\"10.1109/PAPCON.2004.1338381\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this paper is to discuss some of the issues concerning proper receipt, handling and maintenance of small power liquid filled transformers. The paper reviews user technical considerations for transport, receiving and handling of small power transformers at an industrial manufacturing site. Best practices for installation, electrical terminations and field based testing are also reviewed. A list of recommended field and factory transformer tests along with expected test results is discussed.\",\"PeriodicalId\":189773,\"journal\":{\"name\":\"Conference Record of 2004 Annual Pulp and Paper Industry Technical Conference (IEEE Cat. No.04CH37523)\",\"volume\":\"65 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-10-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Record of 2004 Annual Pulp and Paper Industry Technical Conference (IEEE Cat. No.04CH37523)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAPCON.2004.1338381\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of 2004 Annual Pulp and Paper Industry Technical Conference (IEEE Cat. No.04CH37523)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAPCON.2004.1338381","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Field commissioning and maintenance of small power liquid filled transformers
The purpose of this paper is to discuss some of the issues concerning proper receipt, handling and maintenance of small power liquid filled transformers. The paper reviews user technical considerations for transport, receiving and handling of small power transformers at an industrial manufacturing site. Best practices for installation, electrical terminations and field based testing are also reviewed. A list of recommended field and factory transformer tests along with expected test results is discussed.