带返工入口的高混合多阶段生产系统并行看板料性能研究

S. A. Mustafa, J. Prakash, Mei Yong Chong, J. F. Chin
{"title":"带返工入口的高混合多阶段生产系统并行看板料性能研究","authors":"S. A. Mustafa, J. Prakash, Mei Yong Chong, J. F. Chin","doi":"10.1504/IJAOM.2014.064874","DOIUrl":null,"url":null,"abstract":"The present study evaluates the performance of parallel kanban-base stock (PKB) system to regulate the production of high-mix items in a multi-stage shared-machine facility with the entrance of rework. The high-runner products are handled using a kanban system and low-runner products using a base stock system. The PKB systems were differentiated in terms of the model driver, loading rule, and rework entrance policy. The performance measures adopted the total output, average work-in-process, flow times and average machine utilisations. Discrete-event simulations were conducted with an analysis constituted of multi-factor ANOVA and response surface methodology. From the analysis, there is a specific R(LR) value that gives desired performance, and at the same time, its dependency is solely on accuracy of regression equation. Between rework policies, predominantly merge rework entrance policy yields more desirable results as observed within performance measures, compared to original rework entrance policy.","PeriodicalId":191561,"journal":{"name":"Int. J. Adv. Oper. Manag.","volume":"138 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-09-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Performance study of parallel kanban-base stock for a high-mix multi-stage production system with the entrance of rework\",\"authors\":\"S. A. Mustafa, J. Prakash, Mei Yong Chong, J. F. Chin\",\"doi\":\"10.1504/IJAOM.2014.064874\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The present study evaluates the performance of parallel kanban-base stock (PKB) system to regulate the production of high-mix items in a multi-stage shared-machine facility with the entrance of rework. The high-runner products are handled using a kanban system and low-runner products using a base stock system. The PKB systems were differentiated in terms of the model driver, loading rule, and rework entrance policy. The performance measures adopted the total output, average work-in-process, flow times and average machine utilisations. Discrete-event simulations were conducted with an analysis constituted of multi-factor ANOVA and response surface methodology. From the analysis, there is a specific R(LR) value that gives desired performance, and at the same time, its dependency is solely on accuracy of regression equation. Between rework policies, predominantly merge rework entrance policy yields more desirable results as observed within performance measures, compared to original rework entrance policy.\",\"PeriodicalId\":191561,\"journal\":{\"name\":\"Int. J. Adv. Oper. Manag.\",\"volume\":\"138 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-09-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Adv. Oper. Manag.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJAOM.2014.064874\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Adv. Oper. Manag.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJAOM.2014.064874","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本研究评估平行看板基础库存(PKB)系统在具有返工入口的多阶段共享机器设施中调节高混合产品生产的性能。高流道产品使用看板系统,低流道产品使用基础库存系统。PKB系统在模型驱动程序、加载规则和返工入口政策方面进行了区分。性能指标采用总产量、平均在制品、流程时间和平均机器利用率。采用多因素方差分析和响应面法进行离散事件模拟。从分析来看,有一个特定的R(LR)值可以提供期望的性能,同时,它的依赖关系仅取决于回归方程的准确性。在返工策略之间,与原始返工入口策略相比,合并返工入口策略在性能度量中产生了更理想的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Performance study of parallel kanban-base stock for a high-mix multi-stage production system with the entrance of rework
The present study evaluates the performance of parallel kanban-base stock (PKB) system to regulate the production of high-mix items in a multi-stage shared-machine facility with the entrance of rework. The high-runner products are handled using a kanban system and low-runner products using a base stock system. The PKB systems were differentiated in terms of the model driver, loading rule, and rework entrance policy. The performance measures adopted the total output, average work-in-process, flow times and average machine utilisations. Discrete-event simulations were conducted with an analysis constituted of multi-factor ANOVA and response surface methodology. From the analysis, there is a specific R(LR) value that gives desired performance, and at the same time, its dependency is solely on accuracy of regression equation. Between rework policies, predominantly merge rework entrance policy yields more desirable results as observed within performance measures, compared to original rework entrance policy.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信