{"title":"水泵负荷管理对Karot配线性能的影响","authors":"M. Abdel-Salam, M. Nayel, Omar Samir, A. Elnozahy","doi":"10.1109/MEPCON50283.2021.9686190","DOIUrl":null,"url":null,"abstract":"Power quality remains one of the most important aspects of the operation of electrical distribution systems. Starting of induction motors causes a voltage sag which negatively affects the power quality. In the present research, the effect of simultaneous energization of water pumping motors on the operation of Karot distribution line is studied. Transient analysis of induction motors during their acceleration period is pursued using ETAP package. The obtained results indicate that the line experience a 20% voltage sag for 7 seconds on simultaneous energization of 16 motors from the line with a subsequent power outage. Management of motors' operation to avoid their simultaneous acceleration is aimed at improving the power quality of the line. Cascaded operation of the motors results in eliminating the voltage sag problem where the line voltage never drops below 0.95 pu due to motors' acceleration.","PeriodicalId":141478,"journal":{"name":"2021 22nd International Middle East Power Systems Conference (MEPCON)","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Performance of Karot Distribution Line as Influenced by Management of Water Pumping Loads\",\"authors\":\"M. Abdel-Salam, M. Nayel, Omar Samir, A. Elnozahy\",\"doi\":\"10.1109/MEPCON50283.2021.9686190\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Power quality remains one of the most important aspects of the operation of electrical distribution systems. Starting of induction motors causes a voltage sag which negatively affects the power quality. In the present research, the effect of simultaneous energization of water pumping motors on the operation of Karot distribution line is studied. Transient analysis of induction motors during their acceleration period is pursued using ETAP package. The obtained results indicate that the line experience a 20% voltage sag for 7 seconds on simultaneous energization of 16 motors from the line with a subsequent power outage. Management of motors' operation to avoid their simultaneous acceleration is aimed at improving the power quality of the line. Cascaded operation of the motors results in eliminating the voltage sag problem where the line voltage never drops below 0.95 pu due to motors' acceleration.\",\"PeriodicalId\":141478,\"journal\":{\"name\":\"2021 22nd International Middle East Power Systems Conference (MEPCON)\",\"volume\":\"47 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 22nd International Middle East Power Systems Conference (MEPCON)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MEPCON50283.2021.9686190\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 22nd International Middle East Power Systems Conference (MEPCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MEPCON50283.2021.9686190","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Performance of Karot Distribution Line as Influenced by Management of Water Pumping Loads
Power quality remains one of the most important aspects of the operation of electrical distribution systems. Starting of induction motors causes a voltage sag which negatively affects the power quality. In the present research, the effect of simultaneous energization of water pumping motors on the operation of Karot distribution line is studied. Transient analysis of induction motors during their acceleration period is pursued using ETAP package. The obtained results indicate that the line experience a 20% voltage sag for 7 seconds on simultaneous energization of 16 motors from the line with a subsequent power outage. Management of motors' operation to avoid their simultaneous acceleration is aimed at improving the power quality of the line. Cascaded operation of the motors results in eliminating the voltage sag problem where the line voltage never drops below 0.95 pu due to motors' acceleration.