一种诊断PCM执行问题的模糊神经方法

Chin-Chang Chuang, Chia-Chang Tsai
{"title":"一种诊断PCM执行问题的模糊神经方法","authors":"Chin-Chang Chuang, Chia-Chang Tsai","doi":"10.1109/SIEDS.2005.193254","DOIUrl":null,"url":null,"abstract":"This study made a complete survey in professional construction management (PCM) of Taiwan, generalizing 6 critical executing problems in plan and 15 in design. Based on the characteristics of PCM back-propagation neural network (BPNN) and knowledge-based fuzzy neural network (KBFNN), the PCM planning and designing executing problems (PDEP) knowledge base was created for analyzing the causal relationships between these problems and their influence on overall goals of projects. This result indicates that the primary executing problem in planning stage is improper selection of design consultants. Finally, the PCM executing problems diagnosis system was created with access to serve as references to PCM consultants in project management.","PeriodicalId":317634,"journal":{"name":"2005 IEEE Design Symposium, Systems and Information Engineering","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-04-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A fuzzy neural approach for diagnosing PCM executing problems\",\"authors\":\"Chin-Chang Chuang, Chia-Chang Tsai\",\"doi\":\"10.1109/SIEDS.2005.193254\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study made a complete survey in professional construction management (PCM) of Taiwan, generalizing 6 critical executing problems in plan and 15 in design. Based on the characteristics of PCM back-propagation neural network (BPNN) and knowledge-based fuzzy neural network (KBFNN), the PCM planning and designing executing problems (PDEP) knowledge base was created for analyzing the causal relationships between these problems and their influence on overall goals of projects. This result indicates that the primary executing problem in planning stage is improper selection of design consultants. Finally, the PCM executing problems diagnosis system was created with access to serve as references to PCM consultants in project management.\",\"PeriodicalId\":317634,\"journal\":{\"name\":\"2005 IEEE Design Symposium, Systems and Information Engineering\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-04-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005 IEEE Design Symposium, Systems and Information Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SIEDS.2005.193254\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005 IEEE Design Symposium, Systems and Information Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SIEDS.2005.193254","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究对台湾专业建筑管理(PCM)进行全面调查,归纳出规划执行中的6个关键问题和设计执行中的15个关键问题。基于PCM反向传播神经网络(BPNN)和基于知识的模糊神经网络(KBFNN)的特点,建立了PCM规划与设计执行问题(PDEP)知识库,分析了这些问题之间的因果关系及其对项目总体目标的影响。这一结果表明,规划阶段的主要执行问题是设计顾问的选择不当。最后,建立了PCM执行问题诊断系统,为PCM顾问在项目管理中提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A fuzzy neural approach for diagnosing PCM executing problems
This study made a complete survey in professional construction management (PCM) of Taiwan, generalizing 6 critical executing problems in plan and 15 in design. Based on the characteristics of PCM back-propagation neural network (BPNN) and knowledge-based fuzzy neural network (KBFNN), the PCM planning and designing executing problems (PDEP) knowledge base was created for analyzing the causal relationships between these problems and their influence on overall goals of projects. This result indicates that the primary executing problem in planning stage is improper selection of design consultants. Finally, the PCM executing problems diagnosis system was created with access to serve as references to PCM consultants in project management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信