当地灵活市场余额结算

S. Repo, O. Kilkki, S. Annala, J. M. Terras, Bernardo Almeida
{"title":"当地灵活市场余额结算","authors":"S. Repo, O. Kilkki, S. Annala, J. M. Terras, Bernardo Almeida","doi":"10.1049/oap-cired.2021.0180","DOIUrl":null,"url":null,"abstract":"Electricity system needs to balance the consumption and generation every moment. Imbalance settlement considers the differences between the allocated and realised volumes of energy of the market participants. Local market, developed in the project DOMINOES will have an effect on the balance settlement since it introduces an additional market place and local market participants trade energy and possibly also flexibility between each other thus interfering the retailer balances. New balance settlement can be handled via smaller BRP units, independent aggregation or multiple retailers. DOMINOES-project proposes two solutions, where balance responsibility is extended to end-user (‘full local balance settlement model’) or extended to local market level (‘light local balance settlement’). Full model proposes the end-user to have responsibility to keep itself in balance. Local market level adds another layer of local balance settlement before the centralised balance settlement. Both approaches are going to be further evaluated in the project validation.","PeriodicalId":405107,"journal":{"name":"CIRED - Open Access Proceedings Journal","volume":"51 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Local flexibility market balance settlement\",\"authors\":\"S. Repo, O. Kilkki, S. Annala, J. M. Terras, Bernardo Almeida\",\"doi\":\"10.1049/oap-cired.2021.0180\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Electricity system needs to balance the consumption and generation every moment. Imbalance settlement considers the differences between the allocated and realised volumes of energy of the market participants. Local market, developed in the project DOMINOES will have an effect on the balance settlement since it introduces an additional market place and local market participants trade energy and possibly also flexibility between each other thus interfering the retailer balances. New balance settlement can be handled via smaller BRP units, independent aggregation or multiple retailers. DOMINOES-project proposes two solutions, where balance responsibility is extended to end-user (‘full local balance settlement model’) or extended to local market level (‘light local balance settlement’). Full model proposes the end-user to have responsibility to keep itself in balance. Local market level adds another layer of local balance settlement before the centralised balance settlement. Both approaches are going to be further evaluated in the project validation.\",\"PeriodicalId\":405107,\"journal\":{\"name\":\"CIRED - Open Access Proceedings Journal\",\"volume\":\"51 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"CIRED - Open Access Proceedings Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1049/oap-cired.2021.0180\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"CIRED - Open Access Proceedings Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/oap-cired.2021.0180","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

电力系统需要时刻保持用电和发电的平衡。不平衡解决考虑了市场参与者分配和实现的能源量之间的差异。多米诺项目开发的当地市场将对平衡结算产生影响,因为它引入了一个额外的市场,当地市场参与者之间进行能源交易,可能还会相互之间进行灵活性交易,从而干扰零售商的平衡。新的余额结算可以通过较小的BRP单位、独立的聚合或多个零售商来处理。多米诺项目提出了两种解决方案,其中平衡责任扩展到最终用户(“全局部平衡结算模式”)或扩展到当地市场层面(“轻度局部平衡结算”)。完整模型提出最终用户有责任保持自身的平衡。地方市场层面在集中结算之前又增加了一层地方结算。这两种方法都将在项目验证中得到进一步的评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Local flexibility market balance settlement
Electricity system needs to balance the consumption and generation every moment. Imbalance settlement considers the differences between the allocated and realised volumes of energy of the market participants. Local market, developed in the project DOMINOES will have an effect on the balance settlement since it introduces an additional market place and local market participants trade energy and possibly also flexibility between each other thus interfering the retailer balances. New balance settlement can be handled via smaller BRP units, independent aggregation or multiple retailers. DOMINOES-project proposes two solutions, where balance responsibility is extended to end-user (‘full local balance settlement model’) or extended to local market level (‘light local balance settlement’). Full model proposes the end-user to have responsibility to keep itself in balance. Local market level adds another layer of local balance settlement before the centralised balance settlement. Both approaches are going to be further evaluated in the project validation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信