{"title":"先进的质量计划问题","authors":"C. Craig","doi":"10.1109/HOLM.1989.77926","DOIUrl":null,"url":null,"abstract":"Summary form only given. Activities prior to tooling were considered, including: (1) product design FMEA (identification of critical product characteristics, identification of major product characteristics, determination and justification of specification limits, determination of appropriate gaging techniques, and raw material requirements); (2) process FMEA, which encompasses all primary processes such as stamping, molding, plating, and assembly. Also considered were tool qualification (first article requirements, process potential study requirements, gage potential requirements, and long-term process qualification); and quality requirements (Cpk requirements, deviation from target, and quality as produced and shipped evaluation).<<ETX>>","PeriodicalId":441734,"journal":{"name":"Proceedings of the Thirty Fifth Meeting of the IEEE Holm Conference on Electrical Contacts","volume":"110 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1989-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Advanced quality planning issues\",\"authors\":\"C. Craig\",\"doi\":\"10.1109/HOLM.1989.77926\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary form only given. Activities prior to tooling were considered, including: (1) product design FMEA (identification of critical product characteristics, identification of major product characteristics, determination and justification of specification limits, determination of appropriate gaging techniques, and raw material requirements); (2) process FMEA, which encompasses all primary processes such as stamping, molding, plating, and assembly. Also considered were tool qualification (first article requirements, process potential study requirements, gage potential requirements, and long-term process qualification); and quality requirements (Cpk requirements, deviation from target, and quality as produced and shipped evaluation).<<ETX>>\",\"PeriodicalId\":441734,\"journal\":{\"name\":\"Proceedings of the Thirty Fifth Meeting of the IEEE Holm Conference on Electrical Contacts\",\"volume\":\"110 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1989-09-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Thirty Fifth Meeting of the IEEE Holm Conference on Electrical Contacts\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/HOLM.1989.77926\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Thirty Fifth Meeting of the IEEE Holm Conference on Electrical Contacts","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HOLM.1989.77926","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Summary form only given. Activities prior to tooling were considered, including: (1) product design FMEA (identification of critical product characteristics, identification of major product characteristics, determination and justification of specification limits, determination of appropriate gaging techniques, and raw material requirements); (2) process FMEA, which encompasses all primary processes such as stamping, molding, plating, and assembly. Also considered were tool qualification (first article requirements, process potential study requirements, gage potential requirements, and long-term process qualification); and quality requirements (Cpk requirements, deviation from target, and quality as produced and shipped evaluation).<>