先进的质量计划问题

C. Craig
{"title":"先进的质量计划问题","authors":"C. Craig","doi":"10.1109/HOLM.1989.77926","DOIUrl":null,"url":null,"abstract":"Summary form only given. Activities prior to tooling were considered, including: (1) product design FMEA (identification of critical product characteristics, identification of major product characteristics, determination and justification of specification limits, determination of appropriate gaging techniques, and raw material requirements); (2) process FMEA, which encompasses all primary processes such as stamping, molding, plating, and assembly. Also considered were tool qualification (first article requirements, process potential study requirements, gage potential requirements, and long-term process qualification); and quality requirements (Cpk requirements, deviation from target, and quality as produced and shipped evaluation).<<ETX>>","PeriodicalId":441734,"journal":{"name":"Proceedings of the Thirty Fifth Meeting of the IEEE Holm Conference on Electrical Contacts","volume":"110 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1989-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Advanced quality planning issues\",\"authors\":\"C. Craig\",\"doi\":\"10.1109/HOLM.1989.77926\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary form only given. Activities prior to tooling were considered, including: (1) product design FMEA (identification of critical product characteristics, identification of major product characteristics, determination and justification of specification limits, determination of appropriate gaging techniques, and raw material requirements); (2) process FMEA, which encompasses all primary processes such as stamping, molding, plating, and assembly. Also considered were tool qualification (first article requirements, process potential study requirements, gage potential requirements, and long-term process qualification); and quality requirements (Cpk requirements, deviation from target, and quality as produced and shipped evaluation).<<ETX>>\",\"PeriodicalId\":441734,\"journal\":{\"name\":\"Proceedings of the Thirty Fifth Meeting of the IEEE Holm Conference on Electrical Contacts\",\"volume\":\"110 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1989-09-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Thirty Fifth Meeting of the IEEE Holm Conference on Electrical Contacts\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/HOLM.1989.77926\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Thirty Fifth Meeting of the IEEE Holm Conference on Electrical Contacts","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HOLM.1989.77926","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

只提供摘要形式。工装之前的活动被考虑,包括:(1)产品设计FMEA(识别关键产品特性,识别主要产品特性,确定和证明规格限值,确定适当的计量技术和原材料要求);(2)过程FMEA,包括所有初级过程,如冲压、成型、电镀和装配。还考虑了工具确认(首件要求、过程潜在研究要求、量具潜在要求和长期过程确认);和质量要求(Cpk要求,偏离目标,生产和发运质量评估)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Advanced quality planning issues
Summary form only given. Activities prior to tooling were considered, including: (1) product design FMEA (identification of critical product characteristics, identification of major product characteristics, determination and justification of specification limits, determination of appropriate gaging techniques, and raw material requirements); (2) process FMEA, which encompasses all primary processes such as stamping, molding, plating, and assembly. Also considered were tool qualification (first article requirements, process potential study requirements, gage potential requirements, and long-term process qualification); and quality requirements (Cpk requirements, deviation from target, and quality as produced and shipped evaluation).<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信