{"title":"风电并网智能调度","authors":"K. Cheung","doi":"10.1109/ISGTEurope.2011.6162753","DOIUrl":null,"url":null,"abstract":"Due to the increasing penetration of wind generation, the uncertainty of generation required to maintain system balancing has been growing significantly. To deal with such uncertainty, Transmission System Operators require more look-ahead and forecasting capabilities beyond real-time. In this paper a new dispatch system to address the challenges posed by wind energy integration. With advanced demand forecast, wind power forecast, dynamic and robust dispatch algorithm and flexible system configuration, the proposed system will provide adequate system ramping capability to cope with uncertain intermittent resources while maintaining system reliability in large grid operations.","PeriodicalId":419250,"journal":{"name":"2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies","volume":"173 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Smart dispatch for grid integration of wind generation\",\"authors\":\"K. Cheung\",\"doi\":\"10.1109/ISGTEurope.2011.6162753\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Due to the increasing penetration of wind generation, the uncertainty of generation required to maintain system balancing has been growing significantly. To deal with such uncertainty, Transmission System Operators require more look-ahead and forecasting capabilities beyond real-time. In this paper a new dispatch system to address the challenges posed by wind energy integration. With advanced demand forecast, wind power forecast, dynamic and robust dispatch algorithm and flexible system configuration, the proposed system will provide adequate system ramping capability to cope with uncertain intermittent resources while maintaining system reliability in large grid operations.\",\"PeriodicalId\":419250,\"journal\":{\"name\":\"2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies\",\"volume\":\"173 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGTEurope.2011.6162753\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTEurope.2011.6162753","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

由于风力发电的日益普及,维持系统平衡所需的发电不确定性显著增加。为了应对这种不确定性,输电系统运营商需要更多的前瞻性和预测能力,而不是实时的。本文提出了一种新的调度系统来解决风能一体化带来的挑战。通过先进的需求预测、风电预测、动态鲁棒调度算法和灵活的系统配置,该系统将提供足够的系统爬坡能力,以应对不确定的间歇性资源,同时在大型电网运行中保持系统可靠性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Smart dispatch for grid integration of wind generation
Due to the increasing penetration of wind generation, the uncertainty of generation required to maintain system balancing has been growing significantly. To deal with such uncertainty, Transmission System Operators require more look-ahead and forecasting capabilities beyond real-time. In this paper a new dispatch system to address the challenges posed by wind energy integration. With advanced demand forecast, wind power forecast, dynamic and robust dispatch algorithm and flexible system configuration, the proposed system will provide adequate system ramping capability to cope with uncertain intermittent resources while maintaining system reliability in large grid operations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信