Mario Gonzalez Zuñiga, Ernesto Altamirano Flores, José Carlos Alvarez Merino
{"title":"秘鲁安第斯高原农村地区混合系统(太阳风)发电管理","authors":"Mario Gonzalez Zuñiga, Ernesto Altamirano Flores, José Carlos Alvarez Merino","doi":"10.1109/SHIRCON.2018.8593062","DOIUrl":null,"url":null,"abstract":"According to the 2011 Rural Electrification Project conducted by the Ministry of Energy and Mines (MEM), around 36.6% of areas in the high Andean rural area of Peru have very low access to electricity. Since this problem could not be resolved through technological initiatives, a management-based solution is being sought. The proposed methodology identifies electrical power deficiencies by collecting data from the National Institute of Statistics and Information (INEI) at a national, regional, provincial, and particularly, district levels. A proposal was presented based on project management established by the project management institute (PMI) methodology, which has been simulated using HOMER software. The results obtained were compared with the previously obtained results, and it was found that the proposal improves the access to rural power significantly through a wind-photovoltaic hybrid system.","PeriodicalId":408525,"journal":{"name":"2018 IEEE Sciences and Humanities International Research Conference (SHIRCON)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Hybrid System (Solar-Wind) Management for Generating Electricity in High Andean Rural Regions in Peru\",\"authors\":\"Mario Gonzalez Zuñiga, Ernesto Altamirano Flores, José Carlos Alvarez Merino\",\"doi\":\"10.1109/SHIRCON.2018.8593062\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"According to the 2011 Rural Electrification Project conducted by the Ministry of Energy and Mines (MEM), around 36.6% of areas in the high Andean rural area of Peru have very low access to electricity. Since this problem could not be resolved through technological initiatives, a management-based solution is being sought. The proposed methodology identifies electrical power deficiencies by collecting data from the National Institute of Statistics and Information (INEI) at a national, regional, provincial, and particularly, district levels. A proposal was presented based on project management established by the project management institute (PMI) methodology, which has been simulated using HOMER software. The results obtained were compared with the previously obtained results, and it was found that the proposal improves the access to rural power significantly through a wind-photovoltaic hybrid system.\",\"PeriodicalId\":408525,\"journal\":{\"name\":\"2018 IEEE Sciences and Humanities International Research Conference (SHIRCON)\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE Sciences and Humanities International Research Conference (SHIRCON)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SHIRCON.2018.8593062\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Sciences and Humanities International Research Conference (SHIRCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SHIRCON.2018.8593062","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Hybrid System (Solar-Wind) Management for Generating Electricity in High Andean Rural Regions in Peru
According to the 2011 Rural Electrification Project conducted by the Ministry of Energy and Mines (MEM), around 36.6% of areas in the high Andean rural area of Peru have very low access to electricity. Since this problem could not be resolved through technological initiatives, a management-based solution is being sought. The proposed methodology identifies electrical power deficiencies by collecting data from the National Institute of Statistics and Information (INEI) at a national, regional, provincial, and particularly, district levels. A proposal was presented based on project management established by the project management institute (PMI) methodology, which has been simulated using HOMER software. The results obtained were compared with the previously obtained results, and it was found that the proposal improves the access to rural power significantly through a wind-photovoltaic hybrid system.