Mingxing Wu, Ning Wang, Haohao Wang, Tao Zhu, Qing Chen, Xuanding Wang, Saite Yang
{"title":"考虑发电方报价策略影响的政府授权合同分解方法","authors":"Mingxing Wu, Ning Wang, Haohao Wang, Tao Zhu, Qing Chen, Xuanding Wang, Saite Yang","doi":"10.1109/ACPEE56931.2023.10135823","DOIUrl":null,"url":null,"abstract":"Under the background of China's vigorous promotion of electricity market reform, how to solve the market unbalanced expenses under the planning and market mode is an urgent problem to be solved. In order to control the scale of unbalanced funds in the market, this paper comprehensively considers the coupling relationship between the scale of unbalanced funds, the decomposition results of government-authorized contracts, the quotation strategy of power generation entities and the results of market clearing. Based on this, a decomposition method of the government-authorized contract is constructed considering the influence of power generation side quotation strategy. Through numerical example simulation, the coupling between the above parts is verified, and the overall simulation is carried out to analyze the final government-authorized contract decomposition in different scenarios and the corresponding unbalanced funds to verify the function of the above model.","PeriodicalId":403002,"journal":{"name":"2023 8th Asia Conference on Power and Electrical Engineering (ACPEE)","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Decomposition Method of Government-authorized Contracts Considering the Influence of Generation-Side Quotation Strategy\",\"authors\":\"Mingxing Wu, Ning Wang, Haohao Wang, Tao Zhu, Qing Chen, Xuanding Wang, Saite Yang\",\"doi\":\"10.1109/ACPEE56931.2023.10135823\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Under the background of China's vigorous promotion of electricity market reform, how to solve the market unbalanced expenses under the planning and market mode is an urgent problem to be solved. In order to control the scale of unbalanced funds in the market, this paper comprehensively considers the coupling relationship between the scale of unbalanced funds, the decomposition results of government-authorized contracts, the quotation strategy of power generation entities and the results of market clearing. Based on this, a decomposition method of the government-authorized contract is constructed considering the influence of power generation side quotation strategy. Through numerical example simulation, the coupling between the above parts is verified, and the overall simulation is carried out to analyze the final government-authorized contract decomposition in different scenarios and the corresponding unbalanced funds to verify the function of the above model.\",\"PeriodicalId\":403002,\"journal\":{\"name\":\"2023 8th Asia Conference on Power and Electrical Engineering (ACPEE)\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2023 8th Asia Conference on Power and Electrical Engineering (ACPEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ACPEE56931.2023.10135823\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 8th Asia Conference on Power and Electrical Engineering (ACPEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACPEE56931.2023.10135823","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在中国大力推进电力市场化改革的背景下,如何解决计划与市场模式下的市场费用失衡问题是一个亟待解决的问题。为控制市场非均衡资金规模,综合考虑非均衡资金规模、政府授权合同分解结果、发电主体报价策略与市场出清结果之间的耦合关系。在此基础上,构建了考虑发电方报价策略影响的政府授权合同分解方法。通过数值算例仿真,验证了上述各部分之间的耦合性,并进行整体仿真,分析了不同场景下政府授权合同的最终分解以及相应的不平衡资金,验证了上述模型的功能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Decomposition Method of Government-authorized Contracts Considering the Influence of Generation-Side Quotation Strategy
Under the background of China's vigorous promotion of electricity market reform, how to solve the market unbalanced expenses under the planning and market mode is an urgent problem to be solved. In order to control the scale of unbalanced funds in the market, this paper comprehensively considers the coupling relationship between the scale of unbalanced funds, the decomposition results of government-authorized contracts, the quotation strategy of power generation entities and the results of market clearing. Based on this, a decomposition method of the government-authorized contract is constructed considering the influence of power generation side quotation strategy. Through numerical example simulation, the coupling between the above parts is verified, and the overall simulation is carried out to analyze the final government-authorized contract decomposition in different scenarios and the corresponding unbalanced funds to verify the function of the above model.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信