{"title":"提出了一种新的p-轮毂中心问题成本建模的数学公式","authors":"M. Rabbani, Saeed Zameni, Seyed Mahmood Kazemi","doi":"10.1109/ICMSAO.2013.6552550","DOIUrl":null,"url":null,"abstract":"Generally, P-hub center problem aims to establish a hub network wherein the maximum travel times between any given pair of nodes is minimized. The distinctive feature of this paper is proposing a new mathematical formulation for modeling costs in a p-hub center problem. Here, instead of seeing costs as a linear function of distance, we, for the first time, formulated costs that consist of different parts: fixed cost, Health, Safety and Environment cost, energy cost and personnel cost. Such an integrated model results in a hard-to-solve nonlinear formulation. For a small scale standard data set the model is solved by Lingo 8.0 software but the area for solving the formulation for large scale instances is yet to be hunted.","PeriodicalId":339666,"journal":{"name":"2013 5th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-04-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Proposing a new mathematical formulation for modeling costs in a p-hub center problem\",\"authors\":\"M. Rabbani, Saeed Zameni, Seyed Mahmood Kazemi\",\"doi\":\"10.1109/ICMSAO.2013.6552550\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Generally, P-hub center problem aims to establish a hub network wherein the maximum travel times between any given pair of nodes is minimized. The distinctive feature of this paper is proposing a new mathematical formulation for modeling costs in a p-hub center problem. Here, instead of seeing costs as a linear function of distance, we, for the first time, formulated costs that consist of different parts: fixed cost, Health, Safety and Environment cost, energy cost and personnel cost. Such an integrated model results in a hard-to-solve nonlinear formulation. For a small scale standard data set the model is solved by Lingo 8.0 software but the area for solving the formulation for large scale instances is yet to be hunted.\",\"PeriodicalId\":339666,\"journal\":{\"name\":\"2013 5th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO)\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-04-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 5th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICMSAO.2013.6552550\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 5th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMSAO.2013.6552550","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Proposing a new mathematical formulation for modeling costs in a p-hub center problem
Generally, P-hub center problem aims to establish a hub network wherein the maximum travel times between any given pair of nodes is minimized. The distinctive feature of this paper is proposing a new mathematical formulation for modeling costs in a p-hub center problem. Here, instead of seeing costs as a linear function of distance, we, for the first time, formulated costs that consist of different parts: fixed cost, Health, Safety and Environment cost, energy cost and personnel cost. Such an integrated model results in a hard-to-solve nonlinear formulation. For a small scale standard data set the model is solved by Lingo 8.0 software but the area for solving the formulation for large scale instances is yet to be hunted.