马来西亚住宅项目施工延误的原因

M. Z. Ramli, A. Nordin, Nursyadzatul Tasnim Roslin, N. B. Hamid, N. S. Azman, N. Zahari
{"title":"马来西亚住宅项目施工延误的原因","authors":"M. Z. Ramli, A. Nordin, Nursyadzatul Tasnim Roslin, N. B. Hamid, N. S. Azman, N. Zahari","doi":"10.1063/1.5118038","DOIUrl":null,"url":null,"abstract":"Every organization that is involved with the construction industry undoubtedly has delayed progress at some phase in their project or development. Delay in construction project become a common situ...","PeriodicalId":112912,"journal":{"name":"APPLIED PHYSICS OF CONDENSED MATTER (APCOM 2019)","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Causes of construction delay for housing projects in Malaysia\",\"authors\":\"M. Z. Ramli, A. Nordin, Nursyadzatul Tasnim Roslin, N. B. Hamid, N. S. Azman, N. Zahari\",\"doi\":\"10.1063/1.5118038\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Every organization that is involved with the construction industry undoubtedly has delayed progress at some phase in their project or development. Delay in construction project become a common situ...\",\"PeriodicalId\":112912,\"journal\":{\"name\":\"APPLIED PHYSICS OF CONDENSED MATTER (APCOM 2019)\",\"volume\":\"58 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"APPLIED PHYSICS OF CONDENSED MATTER (APCOM 2019)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1063/1.5118038\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"APPLIED PHYSICS OF CONDENSED MATTER (APCOM 2019)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1063/1.5118038","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

毫无疑问,每一个与建筑行业有关的组织都在其项目或发展的某个阶段推迟了进度。施工项目延误成为常见的现场问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Causes of construction delay for housing projects in Malaysia
Every organization that is involved with the construction industry undoubtedly has delayed progress at some phase in their project or development. Delay in construction project become a common situ...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信