R.S. Shekhonin, A. Orlov, I. Kunakkuzhin, V.S. Abdullin, A.P. Popruzhuk
{"title":"通过对哈拉姆普斯科油田塞诺曼尼亚地层水平井钻井过程的规划和地质监测,积累了丰富的经验","authors":"R.S. Shekhonin, A. Orlov, I. Kunakkuzhin, V.S. Abdullin, A.P. Popruzhuk","doi":"10.3997/2214-4609.202154016","DOIUrl":null,"url":null,"abstract":"Summary The results of comprehensive work that led into an increase in drilling efficiency, an improvement in the starting flow rates of drilled wells, and a decrease in estimated economic losses are reflected.","PeriodicalId":105144,"journal":{"name":"Horizontal Wells 2021","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The accumulated experience of planning and geological monitoring the drilling process of horizontal wells into the Cenomanian strata of the Kharampurskoe field\",\"authors\":\"R.S. Shekhonin, A. Orlov, I. Kunakkuzhin, V.S. Abdullin, A.P. Popruzhuk\",\"doi\":\"10.3997/2214-4609.202154016\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary The results of comprehensive work that led into an increase in drilling efficiency, an improvement in the starting flow rates of drilled wells, and a decrease in estimated economic losses are reflected.\",\"PeriodicalId\":105144,\"journal\":{\"name\":\"Horizontal Wells 2021\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-05-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Horizontal Wells 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3997/2214-4609.202154016\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Horizontal Wells 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3997/2214-4609.202154016","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The accumulated experience of planning and geological monitoring the drilling process of horizontal wells into the Cenomanian strata of the Kharampurskoe field
Summary The results of comprehensive work that led into an increase in drilling efficiency, an improvement in the starting flow rates of drilled wells, and a decrease in estimated economic losses are reflected.