{"title":"结合馈线和蓄电池的新型混合动力列车电池充电系统的研制","authors":"Ichiro Masatsuki","doi":"10.1109/IPEC.2010.5542335","DOIUrl":null,"url":null,"abstract":"JR East has been developing \"Feeder line and storage battery hybrid train system\" to decrease negative environmental impact by diesel trains that have been operated in non-electrified lines. The development of the battery charging system on ground that supplies electric power to the hybrid train has been tested since last year, and we decided the outline of the facilities. Construction of the battery charging facilities is scheduled this year and the charging test is also scheduled next year.","PeriodicalId":353540,"journal":{"name":"The 2010 International Power Electronics Conference - ECCE ASIA -","volume":"100 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"20","resultStr":"{\"title\":\"Development of the battery charging system for the new hybrid train that combines feeder line and the storage battery\",\"authors\":\"Ichiro Masatsuki\",\"doi\":\"10.1109/IPEC.2010.5542335\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"JR East has been developing \\\"Feeder line and storage battery hybrid train system\\\" to decrease negative environmental impact by diesel trains that have been operated in non-electrified lines. The development of the battery charging system on ground that supplies electric power to the hybrid train has been tested since last year, and we decided the outline of the facilities. Construction of the battery charging facilities is scheduled this year and the charging test is also scheduled next year.\",\"PeriodicalId\":353540,\"journal\":{\"name\":\"The 2010 International Power Electronics Conference - ECCE ASIA -\",\"volume\":\"100 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"20\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The 2010 International Power Electronics Conference - ECCE ASIA -\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IPEC.2010.5542335\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The 2010 International Power Electronics Conference - ECCE ASIA -","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IPEC.2010.5542335","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Development of the battery charging system for the new hybrid train that combines feeder line and the storage battery
JR East has been developing "Feeder line and storage battery hybrid train system" to decrease negative environmental impact by diesel trains that have been operated in non-electrified lines. The development of the battery charging system on ground that supplies electric power to the hybrid train has been tested since last year, and we decided the outline of the facilities. Construction of the battery charging facilities is scheduled this year and the charging test is also scheduled next year.