{"title":"基于系统方法的高不确定性协同项目改进沟通效果评估","authors":"K. Ichimura, A. Shimoda","doi":"10.1109/iiai-aai53430.2021.00132","DOIUrl":null,"url":null,"abstract":"In recent years, with the progress of economic globalization, corporate and social activities have shifted from vertical integration to horizontal integration. Therefore, the number of collaborative projects in which multiple organizations collaborate is increasing. In such projects, communication between organizations is often a factor in success. Therefore, in this paper, a method for estimating the effect of improving communication between different organizations was examined for collaborative projects with high uncertainty. Since the project is highly unique, the Systems approach focusing on the structure of the project was used as the estimation method. According to the proposed estimation method, the delivery date and cost of the two projects with different uncertainties were compared by changing the degree of communication. As a result, it was confirmed that the effect of improving communication can be grasped quantitatively. These results provide useful suggestions in determining the organizational structure of collaborative projects.","PeriodicalId":414070,"journal":{"name":"2021 10th International Congress on Advanced Applied Informatics (IIAI-AAI)","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Estimation of the Effect of Improving Communication in Collaborative Projects with High Uncertainty based on Systems Approach\",\"authors\":\"K. Ichimura, A. Shimoda\",\"doi\":\"10.1109/iiai-aai53430.2021.00132\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In recent years, with the progress of economic globalization, corporate and social activities have shifted from vertical integration to horizontal integration. Therefore, the number of collaborative projects in which multiple organizations collaborate is increasing. In such projects, communication between organizations is often a factor in success. Therefore, in this paper, a method for estimating the effect of improving communication between different organizations was examined for collaborative projects with high uncertainty. Since the project is highly unique, the Systems approach focusing on the structure of the project was used as the estimation method. According to the proposed estimation method, the delivery date and cost of the two projects with different uncertainties were compared by changing the degree of communication. As a result, it was confirmed that the effect of improving communication can be grasped quantitatively. These results provide useful suggestions in determining the organizational structure of collaborative projects.\",\"PeriodicalId\":414070,\"journal\":{\"name\":\"2021 10th International Congress on Advanced Applied Informatics (IIAI-AAI)\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 10th International Congress on Advanced Applied Informatics (IIAI-AAI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/iiai-aai53430.2021.00132\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 10th International Congress on Advanced Applied Informatics (IIAI-AAI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/iiai-aai53430.2021.00132","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Estimation of the Effect of Improving Communication in Collaborative Projects with High Uncertainty based on Systems Approach
In recent years, with the progress of economic globalization, corporate and social activities have shifted from vertical integration to horizontal integration. Therefore, the number of collaborative projects in which multiple organizations collaborate is increasing. In such projects, communication between organizations is often a factor in success. Therefore, in this paper, a method for estimating the effect of improving communication between different organizations was examined for collaborative projects with high uncertainty. Since the project is highly unique, the Systems approach focusing on the structure of the project was used as the estimation method. According to the proposed estimation method, the delivery date and cost of the two projects with different uncertainties were compared by changing the degree of communication. As a result, it was confirmed that the effect of improving communication can be grasped quantitatively. These results provide useful suggestions in determining the organizational structure of collaborative projects.