通过光伏发电改善混合电网的负荷频率控制

M. Tavakoli, J. Adabi, S. Zabihi
{"title":"通过光伏发电改善混合电网的负荷频率控制","authors":"M. Tavakoli, J. Adabi, S. Zabihi","doi":"10.1109/SGC.2015.7857383","DOIUrl":null,"url":null,"abstract":"Photovoltaic systems cause problems for the power network because of uncertainty of their output power. One solution to eliminate these problems is to increase reserve power of conventional power plants in the network, which increases system cost and imposes more stress on power plants. Nowadays, the focus in photovoltaic systems is to extract the maximum power from photovoltaic modules. This action prevents these systems from participating in frequency control. This paper introduces a scheme to involve photovoltaic system in frequency control by considering a fraction of Photovoltaic generated power as reservation. For simulation, a system comprising of thermal, hydro and photovoltaic units is considered to investigate the performance of proposed method. This simulation is done in MATLAB Simulink. Moreover, a modified objective function is designed in order to satisfy desired specifications such as lower overshoot, fast settling time and smaller steady-state error. Out coming Results from simulation revealed that photovoltaic contribution in frequency control can improve network frequency noticeably.","PeriodicalId":117785,"journal":{"name":"2015 Smart Grid Conference (SGC)","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Improving load frequency control through PV contribution in a hybrid generation grid\",\"authors\":\"M. Tavakoli, J. Adabi, S. Zabihi\",\"doi\":\"10.1109/SGC.2015.7857383\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Photovoltaic systems cause problems for the power network because of uncertainty of their output power. One solution to eliminate these problems is to increase reserve power of conventional power plants in the network, which increases system cost and imposes more stress on power plants. Nowadays, the focus in photovoltaic systems is to extract the maximum power from photovoltaic modules. This action prevents these systems from participating in frequency control. This paper introduces a scheme to involve photovoltaic system in frequency control by considering a fraction of Photovoltaic generated power as reservation. For simulation, a system comprising of thermal, hydro and photovoltaic units is considered to investigate the performance of proposed method. This simulation is done in MATLAB Simulink. Moreover, a modified objective function is designed in order to satisfy desired specifications such as lower overshoot, fast settling time and smaller steady-state error. Out coming Results from simulation revealed that photovoltaic contribution in frequency control can improve network frequency noticeably.\",\"PeriodicalId\":117785,\"journal\":{\"name\":\"2015 Smart Grid Conference (SGC)\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 Smart Grid Conference (SGC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SGC.2015.7857383\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 Smart Grid Conference (SGC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SGC.2015.7857383","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

光伏系统输出功率的不确定性给电网带来了诸多问题。解决这些问题的一种方法是增加电网中常规电厂的备用功率,这增加了系统成本,给电厂带来了更大的压力。从光伏组件中提取最大的功率是目前光伏系统的研究热点。这个动作阻止了这些系统参与频率控制。本文提出了一种将光伏发电的一部分作为预留量,将光伏系统纳入变频控制的方案。以一个由热、水电和光伏机组组成的系统为例,进行了仿真研究。仿真是在MATLAB Simulink中完成的。此外,还设计了一个改进的目标函数,以满足更小的超调量、更快的沉降时间和更小的稳态误差等要求。仿真结果表明,光伏在频率控制中的贡献可以显著提高网络频率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improving load frequency control through PV contribution in a hybrid generation grid
Photovoltaic systems cause problems for the power network because of uncertainty of their output power. One solution to eliminate these problems is to increase reserve power of conventional power plants in the network, which increases system cost and imposes more stress on power plants. Nowadays, the focus in photovoltaic systems is to extract the maximum power from photovoltaic modules. This action prevents these systems from participating in frequency control. This paper introduces a scheme to involve photovoltaic system in frequency control by considering a fraction of Photovoltaic generated power as reservation. For simulation, a system comprising of thermal, hydro and photovoltaic units is considered to investigate the performance of proposed method. This simulation is done in MATLAB Simulink. Moreover, a modified objective function is designed in order to satisfy desired specifications such as lower overshoot, fast settling time and smaller steady-state error. Out coming Results from simulation revealed that photovoltaic contribution in frequency control can improve network frequency noticeably.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信