大型踏面房屋预制施工方法研究。案例研究:泗水Dian Sukolilo Regency Housing

S. Susanto
{"title":"大型踏面房屋预制施工方法研究。案例研究:泗水Dian Sukolilo Regency Housing","authors":"S. Susanto","doi":"10.9744/duts.6.2.49-63","DOIUrl":null,"url":null,"abstract":"This paper discusses the prefabricated construction method by taking a case study of Dian Sukolilo Regency housing construction, Surabaya. Prefabricated construction methods are able to provide faster construction times and better quality. Stages of research will be carried out by processing real data with a simulation calculation approach to obtain the calculation of the budget plan and estimated time of construction using the prefabrication method. The main variables that influence this prefabricated construction method are four namely cost, time, quality and number of units. The increasing number of units will reduce the cost of construction of the construction unit using the prefabrication method. The results of each research calculation will guide the interview to find out the response of the housing developer to the prefabricated construction method whose results will be the conclusion of the study.","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The Study of Prefabricated Construction Methods for Mass Tread Housing Construction. Case Study: Dian Sukolilo Regency Housing, Surabaya\",\"authors\":\"S. Susanto\",\"doi\":\"10.9744/duts.6.2.49-63\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper discusses the prefabricated construction method by taking a case study of Dian Sukolilo Regency housing construction, Surabaya. Prefabricated construction methods are able to provide faster construction times and better quality. Stages of research will be carried out by processing real data with a simulation calculation approach to obtain the calculation of the budget plan and estimated time of construction using the prefabrication method. The main variables that influence this prefabricated construction method are four namely cost, time, quality and number of units. The increasing number of units will reduce the cost of construction of the construction unit using the prefabrication method. The results of each research calculation will guide the interview to find out the response of the housing developer to the prefabricated construction method whose results will be the conclusion of the study.\",\"PeriodicalId\":187066,\"journal\":{\"name\":\"Dimensi Utama Teknik Sipil\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Dimensi Utama Teknik Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.9744/duts.6.2.49-63\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dimensi Utama Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9744/duts.6.2.49-63","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文以泗水Dian Sukolilo Regency住宅建筑为例,探讨装配式施工方法。预制施工方法能够提供更快的施工时间和更好的质量。研究阶段将采用模拟计算的方法处理实际数据,以获得采用预制方法计算的预算计划和预计施工时间。影响这种装配式施工方法的主要变量有四个,即成本、时间、质量和构件数量。单元数量的增加将降低采用预制方法的施工单元的施工成本。每个研究计算的结果将指导访谈找出住房开发商对装配式建筑方法的反应,其结果将是研究的结论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Study of Prefabricated Construction Methods for Mass Tread Housing Construction. Case Study: Dian Sukolilo Regency Housing, Surabaya
This paper discusses the prefabricated construction method by taking a case study of Dian Sukolilo Regency housing construction, Surabaya. Prefabricated construction methods are able to provide faster construction times and better quality. Stages of research will be carried out by processing real data with a simulation calculation approach to obtain the calculation of the budget plan and estimated time of construction using the prefabrication method. The main variables that influence this prefabricated construction method are four namely cost, time, quality and number of units. The increasing number of units will reduce the cost of construction of the construction unit using the prefabrication method. The results of each research calculation will guide the interview to find out the response of the housing developer to the prefabricated construction method whose results will be the conclusion of the study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信