{"title":"断裂链环","authors":"F. Naumann, F. Spies","doi":"10.31399/asm.fach.matlhand.c9001262","DOIUrl":null,"url":null,"abstract":"\n A chain link which was part of the hoisting mechanism of a drop hammer broke after three or four months of service. It was reportedly manufactured of the heat resistant steel 30 Cr-Mo-V 9 (Material No. 1.7707). The fracture of the chain link had a conchoidal structure and ran along the austenitic grain boundaries. Such fractures are characteristic results of strong overheating. The coarse-grained, coarse acicular heat-treated structure of the chain link confirmed overheating. Because temperatures in excess of 1150 deg C are required for the solution of impurities, it is more probable that the real damage was done during the heat-up forging (drop-forging) and could not be removed during heat-treatment.","PeriodicalId":131762,"journal":{"name":"ASM Failure Analysis Case Histories: Material Handling Equipment","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Fractured Chain Link\",\"authors\":\"F. Naumann, F. Spies\",\"doi\":\"10.31399/asm.fach.matlhand.c9001262\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n A chain link which was part of the hoisting mechanism of a drop hammer broke after three or four months of service. It was reportedly manufactured of the heat resistant steel 30 Cr-Mo-V 9 (Material No. 1.7707). The fracture of the chain link had a conchoidal structure and ran along the austenitic grain boundaries. Such fractures are characteristic results of strong overheating. The coarse-grained, coarse acicular heat-treated structure of the chain link confirmed overheating. Because temperatures in excess of 1150 deg C are required for the solution of impurities, it is more probable that the real damage was done during the heat-up forging (drop-forging) and could not be removed during heat-treatment.\",\"PeriodicalId\":131762,\"journal\":{\"name\":\"ASM Failure Analysis Case Histories: Material Handling Equipment\",\"volume\":\"58 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ASM Failure Analysis Case Histories: Material Handling Equipment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31399/asm.fach.matlhand.c9001262\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASM Failure Analysis Case Histories: Material Handling Equipment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31399/asm.fach.matlhand.c9001262","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
落锤起重装置的一个链环在使用了三四个月后断裂了。据报道,它是由耐热钢30cr - mo - v 9(材料号为1.7707)制造的。链环断口呈贝壳状,沿奥氏体晶界延伸。这种断裂是强烈过热的典型结果。粗晶、粗针状的热处理链环组织证实了过热。因为杂质的溶解需要超过1150℃的温度,所以更有可能的是,真正的损坏是在加热锻造(滴锻)过程中造成的,而在热处理过程中无法消除。
A chain link which was part of the hoisting mechanism of a drop hammer broke after three or four months of service. It was reportedly manufactured of the heat resistant steel 30 Cr-Mo-V 9 (Material No. 1.7707). The fracture of the chain link had a conchoidal structure and ran along the austenitic grain boundaries. Such fractures are characteristic results of strong overheating. The coarse-grained, coarse acicular heat-treated structure of the chain link confirmed overheating. Because temperatures in excess of 1150 deg C are required for the solution of impurities, it is more probable that the real damage was done during the heat-up forging (drop-forging) and could not be removed during heat-treatment.