风电与电池并网储能系统优化

Kaitlyn J. Bunker, W. Weaver
{"title":"风电与电池并网储能系统优化","authors":"Kaitlyn J. Bunker, W. Weaver","doi":"10.1109/PECI.2014.6804552","DOIUrl":null,"url":null,"abstract":"This paper implements optimal control strategies in the scenario of a battery energy storage system connected to the electric grid together with a wind turbine. A simplified model for a battery is first developed, along with a state equation model of the system. Optimal control is used to minimize the difference between the actual battery power and the given reference power. The battery is connected to the grid through a buck converter, and the optimal control solution is used to calculate the necessary duty cycle to achieve the desired results. Inequality constraints are added to ensure that the simulation is a realistic model of the behavior of a battery. The control strategy is also demonstrated experimentally with a battery and sample grid system.","PeriodicalId":352005,"journal":{"name":"2014 Power and Energy Conference at Illinois (PECI)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Optimization of grid-connected wind and battery energy storage system\",\"authors\":\"Kaitlyn J. Bunker, W. Weaver\",\"doi\":\"10.1109/PECI.2014.6804552\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper implements optimal control strategies in the scenario of a battery energy storage system connected to the electric grid together with a wind turbine. A simplified model for a battery is first developed, along with a state equation model of the system. Optimal control is used to minimize the difference between the actual battery power and the given reference power. The battery is connected to the grid through a buck converter, and the optimal control solution is used to calculate the necessary duty cycle to achieve the desired results. Inequality constraints are added to ensure that the simulation is a realistic model of the behavior of a battery. The control strategy is also demonstrated experimentally with a battery and sample grid system.\",\"PeriodicalId\":352005,\"journal\":{\"name\":\"2014 Power and Energy Conference at Illinois (PECI)\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-04-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 Power and Energy Conference at Illinois (PECI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PECI.2014.6804552\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Power and Energy Conference at Illinois (PECI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PECI.2014.6804552","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

本文实现了电池储能系统与风力发电机组并网场景下的最优控制策略。首先建立了电池的简化模型,并建立了系统的状态方程模型。最优控制用于最小化实际电池功率与给定参考功率之间的差值。电池通过降压变换器与电网连接,并利用最优控制方案计算必要的占空比以达到期望的结果。加入不等式约束以确保模拟是电池行为的真实模型。通过电池和样本网格系统的实验验证了该控制策略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimization of grid-connected wind and battery energy storage system
This paper implements optimal control strategies in the scenario of a battery energy storage system connected to the electric grid together with a wind turbine. A simplified model for a battery is first developed, along with a state equation model of the system. Optimal control is used to minimize the difference between the actual battery power and the given reference power. The battery is connected to the grid through a buck converter, and the optimal control solution is used to calculate the necessary duty cycle to achieve the desired results. Inequality constraints are added to ensure that the simulation is a realistic model of the behavior of a battery. The control strategy is also demonstrated experimentally with a battery and sample grid system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信