{"title":"无损检测技术在大直径隧道混凝土衬砌脱模时间评估中的应用","authors":"T. Harrell","doi":"10.14359/3726","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":187965,"journal":{"name":"SP-112: Nondestructive Testing of Concrete","volume":"109 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"NDT Use in Evaluating the Form Removal Time for a Large Diameter Tunnel Concrete Lining\",\"authors\":\"T. Harrell\",\"doi\":\"10.14359/3726\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":187965,\"journal\":{\"name\":\"SP-112: Nondestructive Testing of Concrete\",\"volume\":\"109 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SP-112: Nondestructive Testing of Concrete\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14359/3726\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SP-112: Nondestructive Testing of Concrete","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14359/3726","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}