{"title":"电力系统备用电力空间优化分配的综合方法","authors":"S.S. Halilcevic, F. Gubina","doi":"10.1109/PTC.1999.826454","DOIUrl":null,"url":null,"abstract":"This article presents an emergency control system, the results of a series of the offline procedures, designed to act correctively in the case of transmission line outages. The corrective actions have to do with introducing various forms of active and reactive operating reserves (spinning reserve, ready reserve, VAr equipment and load shedding). The suggested methodology, applied through the mentioned procedures, results in information arrangeable in tables and/or a chart of introducing particular segments of the operating reserve, together with the already scheduled generators, selecting the one suited best for the actual level and distribution of the system's load.","PeriodicalId":101688,"journal":{"name":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"On optimal space distribution of ready-reserve in a power system-comprehensive approach\",\"authors\":\"S.S. Halilcevic, F. Gubina\",\"doi\":\"10.1109/PTC.1999.826454\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article presents an emergency control system, the results of a series of the offline procedures, designed to act correctively in the case of transmission line outages. The corrective actions have to do with introducing various forms of active and reactive operating reserves (spinning reserve, ready reserve, VAr equipment and load shedding). The suggested methodology, applied through the mentioned procedures, results in information arrangeable in tables and/or a chart of introducing particular segments of the operating reserve, together with the already scheduled generators, selecting the one suited best for the actual level and distribution of the system's load.\",\"PeriodicalId\":101688,\"journal\":{\"name\":\"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-08-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PTC.1999.826454\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PTC.1999.826454","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
On optimal space distribution of ready-reserve in a power system-comprehensive approach
This article presents an emergency control system, the results of a series of the offline procedures, designed to act correctively in the case of transmission line outages. The corrective actions have to do with introducing various forms of active and reactive operating reserves (spinning reserve, ready reserve, VAr equipment and load shedding). The suggested methodology, applied through the mentioned procedures, results in information arrangeable in tables and/or a chart of introducing particular segments of the operating reserve, together with the already scheduled generators, selecting the one suited best for the actual level and distribution of the system's load.