R. Bachrach, M. Pool, K. Genovese, J.C. Moran, M. O'Halloran, T. J. Connolly
{"title":"300mm晶圆厂架构对比分析设备组对晶圆成本和动态性能的影响","authors":"R. Bachrach, M. Pool, K. Genovese, J.C. Moran, M. O'Halloran, T. J. Connolly","doi":"10.1109/ISSM.2001.962992","DOIUrl":null,"url":null,"abstract":"A semiconductor fabricator is a highly complex system that hosts the process tools capable of manufacturing IC product devices based upon their process flows. A typical process flow for a 0.15 /spl mu/m logic process consists of 300 to 400 steps with 22 to 24 mask steps. A variety of equipment sets and organizational architectures are possible for any process flow. The results of a comparative analysis of two such 300 mm FAB architectures are presented in this report. The impact of equipment sets on fab Sizing, Cost, and Performance are described as a function of operating characteristics.","PeriodicalId":356225,"journal":{"name":"2001 IEEE International Symposium on Semiconductor Manufacturing. ISSM 2001. Conference Proceedings (Cat. No.01CH37203)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-10-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Comparative analysis of 300 mm FAB architectures impact of equipment sets on wafer cost and dynamic performance\",\"authors\":\"R. Bachrach, M. Pool, K. Genovese, J.C. Moran, M. O'Halloran, T. J. Connolly\",\"doi\":\"10.1109/ISSM.2001.962992\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A semiconductor fabricator is a highly complex system that hosts the process tools capable of manufacturing IC product devices based upon their process flows. A typical process flow for a 0.15 /spl mu/m logic process consists of 300 to 400 steps with 22 to 24 mask steps. A variety of equipment sets and organizational architectures are possible for any process flow. The results of a comparative analysis of two such 300 mm FAB architectures are presented in this report. The impact of equipment sets on fab Sizing, Cost, and Performance are described as a function of operating characteristics.\",\"PeriodicalId\":356225,\"journal\":{\"name\":\"2001 IEEE International Symposium on Semiconductor Manufacturing. ISSM 2001. Conference Proceedings (Cat. No.01CH37203)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-10-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2001 IEEE International Symposium on Semiconductor Manufacturing. ISSM 2001. Conference Proceedings (Cat. No.01CH37203)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISSM.2001.962992\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2001 IEEE International Symposium on Semiconductor Manufacturing. ISSM 2001. Conference Proceedings (Cat. No.01CH37203)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISSM.2001.962992","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Comparative analysis of 300 mm FAB architectures impact of equipment sets on wafer cost and dynamic performance
A semiconductor fabricator is a highly complex system that hosts the process tools capable of manufacturing IC product devices based upon their process flows. A typical process flow for a 0.15 /spl mu/m logic process consists of 300 to 400 steps with 22 to 24 mask steps. A variety of equipment sets and organizational architectures are possible for any process flow. The results of a comparative analysis of two such 300 mm FAB architectures are presented in this report. The impact of equipment sets on fab Sizing, Cost, and Performance are described as a function of operating characteristics.