PMU- scada混合系统中的PMU位置确定

Muhamad Hazrirrahman Wakti, Lesnanto Multa Putranto, S. P. Hadi, Muhammad Yasirroni, Akmalazakia Fatan Derana Marsiano
{"title":"PMU- scada混合系统中的PMU位置确定","authors":"Muhamad Hazrirrahman Wakti, Lesnanto Multa Putranto, S. P. Hadi, Muhammad Yasirroni, Akmalazakia Fatan Derana Marsiano","doi":"10.1109/ICITEE49829.2020.9271728","DOIUrl":null,"url":null,"abstract":"The accurate real-time state estimation is needed to perform real-time monitoring and control. However, the current power system uses SCADA technology as a tool for monitoring and control. SCADA existing measurement device has a few disadvantages: low accuracy, low sampling rate in measuring the measurements data, and asynchronous measurements between instrument. Due to those disadvantages, state estimation resulted has low accuracy, and not in real-time. These disadvantages can be minimized by installing several phasor measurement unit (PMU). IEEE-30 bus test system is applied to simulate the proposed technique. The result shows, the required PMU should be installed in power system that already has 116 conventional SCADA measurements is 6. The location of these PMUs are in buses 2, 10, 12, 15, 25, and 27. That result is achieved in 320 iteration of genetic algorithm (GA). In this paper, mean absolute error (MAE) is used to asses the state estimation accuracy. The value of $\\overline {MAE} $ system with PMU is 7.20718X10−6. While, the value of $\\overline {MAE} $ system without PMU is 0.110162054.","PeriodicalId":245013,"journal":{"name":"2020 12th International Conference on Information Technology and Electrical Engineering (ICITEE)","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PMU Location Determination in a Hybrid PMU-SCADA System\",\"authors\":\"Muhamad Hazrirrahman Wakti, Lesnanto Multa Putranto, S. P. Hadi, Muhammad Yasirroni, Akmalazakia Fatan Derana Marsiano\",\"doi\":\"10.1109/ICITEE49829.2020.9271728\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The accurate real-time state estimation is needed to perform real-time monitoring and control. However, the current power system uses SCADA technology as a tool for monitoring and control. SCADA existing measurement device has a few disadvantages: low accuracy, low sampling rate in measuring the measurements data, and asynchronous measurements between instrument. Due to those disadvantages, state estimation resulted has low accuracy, and not in real-time. These disadvantages can be minimized by installing several phasor measurement unit (PMU). IEEE-30 bus test system is applied to simulate the proposed technique. The result shows, the required PMU should be installed in power system that already has 116 conventional SCADA measurements is 6. The location of these PMUs are in buses 2, 10, 12, 15, 25, and 27. That result is achieved in 320 iteration of genetic algorithm (GA). In this paper, mean absolute error (MAE) is used to asses the state estimation accuracy. The value of $\\\\overline {MAE} $ system with PMU is 7.20718X10−6. While, the value of $\\\\overline {MAE} $ system without PMU is 0.110162054.\",\"PeriodicalId\":245013,\"journal\":{\"name\":\"2020 12th International Conference on Information Technology and Electrical Engineering (ICITEE)\",\"volume\":\"34 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 12th International Conference on Information Technology and Electrical Engineering (ICITEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICITEE49829.2020.9271728\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 12th International Conference on Information Technology and Electrical Engineering (ICITEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICITEE49829.2020.9271728","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

为了实现实时监测和控制,需要精确的实时状态估计。然而,目前的电力系统大多采用SCADA技术作为监控工具。现有的SCADA测量设备存在精度低、测量数据采样率低、仪器间测量不同步等缺点。由于这些缺点,所得到的状态估计精度较低,且不具有实时性。这些缺点可以通过安装几个相量测量单元(PMU)来最小化。采用IEEE-30总线测试系统对该技术进行了仿真。结果表明,所需的PMU应安装在已具有116个常规SCADA测量值的电力系统中。这些pmu的位置在总线2、10、12、15、25和27。该结果是在遗传算法(GA)的320次迭代中获得的。本文采用平均绝对误差(MAE)来评估状态估计的精度。$\overline {MAE} $ system with PMU的值为7.20718X10−6。没有PMU的$\overline {MAE} $ system的值为0.110162054。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PMU Location Determination in a Hybrid PMU-SCADA System
The accurate real-time state estimation is needed to perform real-time monitoring and control. However, the current power system uses SCADA technology as a tool for monitoring and control. SCADA existing measurement device has a few disadvantages: low accuracy, low sampling rate in measuring the measurements data, and asynchronous measurements between instrument. Due to those disadvantages, state estimation resulted has low accuracy, and not in real-time. These disadvantages can be minimized by installing several phasor measurement unit (PMU). IEEE-30 bus test system is applied to simulate the proposed technique. The result shows, the required PMU should be installed in power system that already has 116 conventional SCADA measurements is 6. The location of these PMUs are in buses 2, 10, 12, 15, 25, and 27. That result is achieved in 320 iteration of genetic algorithm (GA). In this paper, mean absolute error (MAE) is used to asses the state estimation accuracy. The value of $\overline {MAE} $ system with PMU is 7.20718X10−6. While, the value of $\overline {MAE} $ system without PMU is 0.110162054.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信