{"title":"占碑市Batang Hari区Mersam区PT. Sentosa Prima coal开采规划区煤炭资源储量的截面法计算","authors":"Muhammad Jundi Haikal Azis, Yazid Fanani","doi":"10.31284/j.jemt.2022.v3i1.3603","DOIUrl":null,"url":null,"abstract":"PT. Sentosa Prima Coal is a company engaged in the Coal sector. This company is located in Mersam District, Batanghari Regency, Jambi Province. The area of the mining business permit of PT. Sentosa Prima Coal of 2000 Ha. Mining activities require reserve calculations before mining activities are carried out, including making a coal deposit model, calculating coal resources, pit design, calculating coal reserves, and calculating the stripping ratio (SR) value, so that later the number of coal reserves can be obtained and obtain a deposit model. The modeling and calculation of reserves were carried out using the \"cross-section\" with the help of Surpac 6.6.2 software. Based on the Cross Section's estimation results, coal resources for PT. Sentosa Prima Coal amounted to 8,073,932 tons, and coal reserves 6,662,514 tons, the volume of Overburden for the planned mining activity area was 24,779,981 BCM, and the stripping ratio value was obtained 1:4.","PeriodicalId":363304,"journal":{"name":"Journal of Earth and Marine Technology (JEMT)","volume":"59 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Calculation of coal resources and reserves using the cross-section method in the mining plan area of PT. Sentosa Prima Coal in Mersam District, Batang Hari District, Jambi\",\"authors\":\"Muhammad Jundi Haikal Azis, Yazid Fanani\",\"doi\":\"10.31284/j.jemt.2022.v3i1.3603\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT. Sentosa Prima Coal is a company engaged in the Coal sector. This company is located in Mersam District, Batanghari Regency, Jambi Province. The area of the mining business permit of PT. Sentosa Prima Coal of 2000 Ha. Mining activities require reserve calculations before mining activities are carried out, including making a coal deposit model, calculating coal resources, pit design, calculating coal reserves, and calculating the stripping ratio (SR) value, so that later the number of coal reserves can be obtained and obtain a deposit model. The modeling and calculation of reserves were carried out using the \\\"cross-section\\\" with the help of Surpac 6.6.2 software. Based on the Cross Section's estimation results, coal resources for PT. Sentosa Prima Coal amounted to 8,073,932 tons, and coal reserves 6,662,514 tons, the volume of Overburden for the planned mining activity area was 24,779,981 BCM, and the stripping ratio value was obtained 1:4.\",\"PeriodicalId\":363304,\"journal\":{\"name\":\"Journal of Earth and Marine Technology (JEMT)\",\"volume\":\"59 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Earth and Marine Technology (JEMT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31284/j.jemt.2022.v3i1.3603\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Earth and Marine Technology (JEMT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31284/j.jemt.2022.v3i1.3603","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
PT. Sentosa Prima Coal是一家从事煤炭行业的公司。该公司位于占碑省巴丹哈里县的Mersam区。圣淘沙普里玛煤业2000公顷的采矿经营许可面积。采矿活动在进行采矿活动前需要进行储量计算,包括建立煤层模型、计算煤炭资源、设计矿井、计算煤炭储量、计算剥离比(SR)值,以便后期得到煤炭储量的数量,得到矿床模型。利用Surpac 6.6.2软件,利用“横截面”模型对储量进行建模和计算。根据Cross Section估算结果,PT. Sentosa Prima coal煤炭资源量为8,073,932吨,煤炭储量6,662,514吨,规划开采活动区覆盖层体积为24,779,981 BCM,剥离比为1:4。
Calculation of coal resources and reserves using the cross-section method in the mining plan area of PT. Sentosa Prima Coal in Mersam District, Batang Hari District, Jambi
PT. Sentosa Prima Coal is a company engaged in the Coal sector. This company is located in Mersam District, Batanghari Regency, Jambi Province. The area of the mining business permit of PT. Sentosa Prima Coal of 2000 Ha. Mining activities require reserve calculations before mining activities are carried out, including making a coal deposit model, calculating coal resources, pit design, calculating coal reserves, and calculating the stripping ratio (SR) value, so that later the number of coal reserves can be obtained and obtain a deposit model. The modeling and calculation of reserves were carried out using the "cross-section" with the help of Surpac 6.6.2 software. Based on the Cross Section's estimation results, coal resources for PT. Sentosa Prima Coal amounted to 8,073,932 tons, and coal reserves 6,662,514 tons, the volume of Overburden for the planned mining activity area was 24,779,981 BCM, and the stripping ratio value was obtained 1:4.