基于LCC的项目前期辅助决策模型的构建与应用研究

Hongwei Wang, Wen Zhang, Sheng-lu Zhang, Fei Wei, Yajing Ji, Fengying Hu
{"title":"基于LCC的项目前期辅助决策模型的构建与应用研究","authors":"Hongwei Wang, Wen Zhang, Sheng-lu Zhang, Fei Wei, Yajing Ji, Fengying Hu","doi":"10.1109/IFEEA57288.2022.10037940","DOIUrl":null,"url":null,"abstract":"Based on the research results of life-cycle cost, the application scenarios in the early stage of the project are explored. In the past, equipment selection was carried out based on experience on the basis of the purchase cost and related technical parameters, without considering the cost during the later operation of equipment. This paper explores the application of life-cycle cost for equipment selection, so as to provide a scientific and effective quantitative analysis tool for equipment selection. In the past, the cost of financial evaluation projects of feasibility study used simple proportion estimation method. In this paper, we explore the application of life-cycle cost to calculate project cost, so as to improve the calculation accuracy of financial evaluation of feasibility study, promote the deep integration of finance, equipment and investment business decision-making, and improve investment efficiency and benefit.","PeriodicalId":304779,"journal":{"name":"2022 9th International Forum on Electrical Engineering and Automation (IFEEA)","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on the construction and application of LCC based auxiliary decision model in the early stage of project\",\"authors\":\"Hongwei Wang, Wen Zhang, Sheng-lu Zhang, Fei Wei, Yajing Ji, Fengying Hu\",\"doi\":\"10.1109/IFEEA57288.2022.10037940\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Based on the research results of life-cycle cost, the application scenarios in the early stage of the project are explored. In the past, equipment selection was carried out based on experience on the basis of the purchase cost and related technical parameters, without considering the cost during the later operation of equipment. This paper explores the application of life-cycle cost for equipment selection, so as to provide a scientific and effective quantitative analysis tool for equipment selection. In the past, the cost of financial evaluation projects of feasibility study used simple proportion estimation method. In this paper, we explore the application of life-cycle cost to calculate project cost, so as to improve the calculation accuracy of financial evaluation of feasibility study, promote the deep integration of finance, equipment and investment business decision-making, and improve investment efficiency and benefit.\",\"PeriodicalId\":304779,\"journal\":{\"name\":\"2022 9th International Forum on Electrical Engineering and Automation (IFEEA)\",\"volume\":\"61 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 9th International Forum on Electrical Engineering and Automation (IFEEA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IFEEA57288.2022.10037940\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 9th International Forum on Electrical Engineering and Automation (IFEEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IFEEA57288.2022.10037940","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在生命周期成本研究成果的基础上,探讨了项目前期的应用场景。以往的设备选型都是根据采购成本和相关技术参数根据经验进行的,没有考虑设备后期运行的成本。探讨全寿命周期成本在设备选型中的应用,为设备选型提供科学有效的定量分析工具。过去,可行性研究财务评价项目的成本采用简单的比例估算法。本文探索应用生命周期成本法计算项目成本,以提高可行性研究财务评价的计算精度,促进财务、设备和投资业务决策的深度融合,提高投资效率和效益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on the construction and application of LCC based auxiliary decision model in the early stage of project
Based on the research results of life-cycle cost, the application scenarios in the early stage of the project are explored. In the past, equipment selection was carried out based on experience on the basis of the purchase cost and related technical parameters, without considering the cost during the later operation of equipment. This paper explores the application of life-cycle cost for equipment selection, so as to provide a scientific and effective quantitative analysis tool for equipment selection. In the past, the cost of financial evaluation projects of feasibility study used simple proportion estimation method. In this paper, we explore the application of life-cycle cost to calculate project cost, so as to improve the calculation accuracy of financial evaluation of feasibility study, promote the deep integration of finance, equipment and investment business decision-making, and improve investment efficiency and benefit.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信