{"title":"运输公司职业风险管理","authors":"R. Stasiak-Betlejewska","doi":"10.2478/czoto-2022-0014","DOIUrl":null,"url":null,"abstract":"Abstract The purpose of risk analysis is to provide a concrete basis for risk decisions that can be made as part of the risk management process in comparing the risk outcomes with risk acceptability criteria. The main objective of the occupational risk assessment presented in the paper is to provide employees with effective protection of the health and life of employees against hazards occurring in the work environment, as best as possible under specific conditions.","PeriodicalId":315981,"journal":{"name":"System Safety: Human - Technical Facility - Environment","volume":"117 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Occupational Risk Management in the Transport Company\",\"authors\":\"R. Stasiak-Betlejewska\",\"doi\":\"10.2478/czoto-2022-0014\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The purpose of risk analysis is to provide a concrete basis for risk decisions that can be made as part of the risk management process in comparing the risk outcomes with risk acceptability criteria. The main objective of the occupational risk assessment presented in the paper is to provide employees with effective protection of the health and life of employees against hazards occurring in the work environment, as best as possible under specific conditions.\",\"PeriodicalId\":315981,\"journal\":{\"name\":\"System Safety: Human - Technical Facility - Environment\",\"volume\":\"117 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"System Safety: Human - Technical Facility - Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/czoto-2022-0014\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"System Safety: Human - Technical Facility - Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/czoto-2022-0014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Occupational Risk Management in the Transport Company
Abstract The purpose of risk analysis is to provide a concrete basis for risk decisions that can be made as part of the risk management process in comparing the risk outcomes with risk acceptability criteria. The main objective of the occupational risk assessment presented in the paper is to provide employees with effective protection of the health and life of employees against hazards occurring in the work environment, as best as possible under specific conditions.