{"title":"建筑采购变革的驱动因素及其对管理的影响","authors":"J. Harty, R. Laing","doi":"10.1109/VIZ.2009.53","DOIUrl":null,"url":null,"abstract":"Building Information Modelling (BIM) is transforming design and construction to achieve greater industrial-type procurement. Both general contractors and reluctantly sub contractors are beginning to adopt both BIM and Integrated Project Delivery (IPD) to improve performance and to reduce waste due to poor information ranging from inaccuracies, delays, misplacement, inconsistencies and uncoordination right through all construction phases. The synchronisation required to achieve this can best be supplied by technologists who have the ability to liaise with all the disciplines found in the construction process without compromising the specific roles found in the design team.","PeriodicalId":315752,"journal":{"name":"2009 Second International Conference in Visualisation","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Drivers for Change in Construction Procurement and its Impact on Management\",\"authors\":\"J. Harty, R. Laing\",\"doi\":\"10.1109/VIZ.2009.53\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Building Information Modelling (BIM) is transforming design and construction to achieve greater industrial-type procurement. Both general contractors and reluctantly sub contractors are beginning to adopt both BIM and Integrated Project Delivery (IPD) to improve performance and to reduce waste due to poor information ranging from inaccuracies, delays, misplacement, inconsistencies and uncoordination right through all construction phases. The synchronisation required to achieve this can best be supplied by technologists who have the ability to liaise with all the disciplines found in the construction process without compromising the specific roles found in the design team.\",\"PeriodicalId\":315752,\"journal\":{\"name\":\"2009 Second International Conference in Visualisation\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-07-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Second International Conference in Visualisation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/VIZ.2009.53\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Second International Conference in Visualisation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/VIZ.2009.53","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

建筑信息模型(BIM)正在改变设计和建造,以实现更多的工业型采购。总承包商和不情愿的分包商都开始采用BIM和综合项目交付(IPD)来提高绩效,并减少由于信息不准确、延迟、错位、不一致和不协调而导致的浪费,这些信息贯穿整个施工阶段。实现这一目标所需的同步最好由技术人员提供,他们有能力在施工过程中与所有学科保持联系,而不会损害设计团队中的特定角色。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Drivers for Change in Construction Procurement and its Impact on Management
Building Information Modelling (BIM) is transforming design and construction to achieve greater industrial-type procurement. Both general contractors and reluctantly sub contractors are beginning to adopt both BIM and Integrated Project Delivery (IPD) to improve performance and to reduce waste due to poor information ranging from inaccuracies, delays, misplacement, inconsistencies and uncoordination right through all construction phases. The synchronisation required to achieve this can best be supplied by technologists who have the ability to liaise with all the disciplines found in the construction process without compromising the specific roles found in the design team.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信