使用节拍计划和节拍控制的大型项目-创建和维持多任务流程

J. Dlouhy, Miguel Ricalde, Bernardo Cossio, Carlos Januncio
{"title":"使用节拍计划和节拍控制的大型项目-创建和维持多任务流程","authors":"J. Dlouhy, Miguel Ricalde, Bernardo Cossio, Carlos Januncio","doi":"10.24928/2018/0503","DOIUrl":null,"url":null,"abstract":"Takt planning and Takt control (TPTC) is a production system approach that is most commonly used in individual construction projects. The approach has not yet been implemented systematically in a large-scale project, like a Greenfield automotive plant (complete new plant from scratch) with all facilities. Furthermore, its use has not been documented in construction in Mexico. Most projects describing TPTC in research are single contractor projects, implemented by a single construction company. This paper describes a real project with over 15 different facilities using Takt planning and Takt control (TPTC), in a large scale green field automotive plant with 5 main general contractors collaborating together with the client. It shows the demands and the effects of large scale projects using the method of TPTC within a Lean philosophy and describes the system that was designed and implemented. As the main contribution from this paper, a system and its results for creating a Lean culture, collaboration, transparency, planning and overall project control within a multitasking flow is described and validated.","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Large Scale Project Using Takt Planning and Takt Control-Creating and Sustaining Multitasking Flow\",\"authors\":\"J. Dlouhy, Miguel Ricalde, Bernardo Cossio, Carlos Januncio\",\"doi\":\"10.24928/2018/0503\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Takt planning and Takt control (TPTC) is a production system approach that is most commonly used in individual construction projects. The approach has not yet been implemented systematically in a large-scale project, like a Greenfield automotive plant (complete new plant from scratch) with all facilities. Furthermore, its use has not been documented in construction in Mexico. Most projects describing TPTC in research are single contractor projects, implemented by a single construction company. This paper describes a real project with over 15 different facilities using Takt planning and Takt control (TPTC), in a large scale green field automotive plant with 5 main general contractors collaborating together with the client. It shows the demands and the effects of large scale projects using the method of TPTC within a Lean philosophy and describes the system that was designed and implemented. As the main contribution from this paper, a system and its results for creating a Lean culture, collaboration, transparency, planning and overall project control within a multitasking flow is described and validated.\",\"PeriodicalId\":419313,\"journal\":{\"name\":\"26th Annual Conference of the International Group for Lean Construction\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-07-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"26th Annual Conference of the International Group for Lean Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2018/0503\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0503","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

工位规划和工位控制(TPTC)是一种生产系统方法,最常用于个别建设项目。该方法尚未在大型项目中系统地实施,例如拥有所有设施的绿地汽车工厂(从头开始的完整新工厂)。此外,在墨西哥的建筑中没有使用它的记录。研究中描述TPTC的大多数项目都是单个承包商项目,由单个建筑公司实施。本文描述了一个真实的项目,在一个大型绿地汽车工厂中,有5个主要的总承包商与客户一起合作,使用Takt规划和Takt控制(TPTC),有超过15个不同的设施。它展示了在精益哲学中使用TPTC方法的大型项目的需求和效果,并描述了设计和实施的系统。作为本文的主要贡献,本文描述并验证了在多任务流程中创建精益文化、协作、透明度、计划和整体项目控制的系统及其结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Large Scale Project Using Takt Planning and Takt Control-Creating and Sustaining Multitasking Flow
Takt planning and Takt control (TPTC) is a production system approach that is most commonly used in individual construction projects. The approach has not yet been implemented systematically in a large-scale project, like a Greenfield automotive plant (complete new plant from scratch) with all facilities. Furthermore, its use has not been documented in construction in Mexico. Most projects describing TPTC in research are single contractor projects, implemented by a single construction company. This paper describes a real project with over 15 different facilities using Takt planning and Takt control (TPTC), in a large scale green field automotive plant with 5 main general contractors collaborating together with the client. It shows the demands and the effects of large scale projects using the method of TPTC within a Lean philosophy and describes the system that was designed and implemented. As the main contribution from this paper, a system and its results for creating a Lean culture, collaboration, transparency, planning and overall project control within a multitasking flow is described and validated.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信