{"title":"自动抄表和高级计量基础设施项目","authors":"Husam A. Foudeh, A. Mokhtar","doi":"10.1109/JIEEEC.2015.7470753","DOIUrl":null,"url":null,"abstract":"Two communication media between meter and server are applicable in Electrical Distribution Company (EDCO) in Jordan, namely, the Power Line Carrier (PLC) and the General Packet Radio Service (GPRS). In this paper, we discuss the implementation of these two communication media in the Automated Meter Reading (AMR) and the Advanced Metering Infrastructure (AMI) project in Jordan; and also point-out the main advantages and dis-advantages of using such grid of AMR/AMI based on these communication media.","PeriodicalId":432900,"journal":{"name":"2015 9th Jordanian International Electrical and Electronics Engineering Conference (JIEEEC)","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":"{\"title\":\"Automated Meter Reading and Advanced Metering Infrastructure projects\",\"authors\":\"Husam A. Foudeh, A. Mokhtar\",\"doi\":\"10.1109/JIEEEC.2015.7470753\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Two communication media between meter and server are applicable in Electrical Distribution Company (EDCO) in Jordan, namely, the Power Line Carrier (PLC) and the General Packet Radio Service (GPRS). In this paper, we discuss the implementation of these two communication media in the Automated Meter Reading (AMR) and the Advanced Metering Infrastructure (AMI) project in Jordan; and also point-out the main advantages and dis-advantages of using such grid of AMR/AMI based on these communication media.\",\"PeriodicalId\":432900,\"journal\":{\"name\":\"2015 9th Jordanian International Electrical and Electronics Engineering Conference (JIEEEC)\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"16\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 9th Jordanian International Electrical and Electronics Engineering Conference (JIEEEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/JIEEEC.2015.7470753\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 9th Jordanian International Electrical and Electronics Engineering Conference (JIEEEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/JIEEEC.2015.7470753","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Automated Meter Reading and Advanced Metering Infrastructure projects
Two communication media between meter and server are applicable in Electrical Distribution Company (EDCO) in Jordan, namely, the Power Line Carrier (PLC) and the General Packet Radio Service (GPRS). In this paper, we discuss the implementation of these two communication media in the Automated Meter Reading (AMR) and the Advanced Metering Infrastructure (AMI) project in Jordan; and also point-out the main advantages and dis-advantages of using such grid of AMR/AMI based on these communication media.