人因工程在300mw核电站主控室设计中的应用

Hongxing Miao
{"title":"人因工程在300mw核电站主控室设计中的应用","authors":"Hongxing Miao","doi":"10.1109/HFPP.1992.283344","DOIUrl":null,"url":null,"abstract":"The author discusses human factors engineering as applied to main nuclear power plant (NPP) control room design, including the design principles, control room layout, control and information equipment, environment conditions, communications system, etc. The main control room for a new 300 MW NPP will be modified and improved on the basis of the Qinshan 300 MW NPP design.<<ETX>>","PeriodicalId":150946,"journal":{"name":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Application of the human factors engineering to the main control room design for 300 MW NPP\",\"authors\":\"Hongxing Miao\",\"doi\":\"10.1109/HFPP.1992.283344\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The author discusses human factors engineering as applied to main nuclear power plant (NPP) control room design, including the design principles, control room layout, control and information equipment, environment conditions, communications system, etc. The main control room for a new 300 MW NPP will be modified and improved on the basis of the Qinshan 300 MW NPP design.<<ETX>>\",\"PeriodicalId\":150946,\"journal\":{\"name\":\"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/HFPP.1992.283344\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HFPP.1992.283344","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

论述了人因工程在主核电站控制室设计中的应用,包括设计原则、控制室布置、控制与信息设备、环境条件、通信系统等。新建300兆瓦核电站的主控制室将在秦山300兆瓦核电站设计的基础上进行修改和改进。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Application of the human factors engineering to the main control room design for 300 MW NPP
The author discusses human factors engineering as applied to main nuclear power plant (NPP) control room design, including the design principles, control room layout, control and information equipment, environment conditions, communications system, etc. The main control room for a new 300 MW NPP will be modified and improved on the basis of the Qinshan 300 MW NPP design.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信