{"title":"项目管理知识领域挑战的评估研究","authors":"Nahom Kebede","doi":"10.53983/ijmds.v10n10.001","DOIUrl":null,"url":null,"abstract":"This study was conducted to identify the most challenging PMKAs in the external funded agricultural research projects of EIAR. The qualitative research approach with descriptive research designs was implemented. Both primary and secondary data collection methods were used. Respondents were purposively identified. Based on this technique 124 respondents were identified. Respondents were working in 30 projects. Interviewees were also organized for 30 key informants from each project. The collected data were analysed through SPSS. The Cronbach’s Alpha test result of the questionnaire is 0.85. The result shows that, challenges related with organizational environment, project risk management, project time management, project cost management, and project quality management are the most challenging knowledge areas whereas the other PMKAs are moderately challenging.","PeriodicalId":424872,"journal":{"name":"International Journal of Management and Development Studies","volume":"11 2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessment study on the Challenges of Project Management Knowledge Areas\",\"authors\":\"Nahom Kebede\",\"doi\":\"10.53983/ijmds.v10n10.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study was conducted to identify the most challenging PMKAs in the external funded agricultural research projects of EIAR. The qualitative research approach with descriptive research designs was implemented. Both primary and secondary data collection methods were used. Respondents were purposively identified. Based on this technique 124 respondents were identified. Respondents were working in 30 projects. Interviewees were also organized for 30 key informants from each project. The collected data were analysed through SPSS. The Cronbach’s Alpha test result of the questionnaire is 0.85. The result shows that, challenges related with organizational environment, project risk management, project time management, project cost management, and project quality management are the most challenging knowledge areas whereas the other PMKAs are moderately challenging.\",\"PeriodicalId\":424872,\"journal\":{\"name\":\"International Journal of Management and Development Studies\",\"volume\":\"11 2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Management and Development Studies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.53983/ijmds.v10n10.001\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Management and Development Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53983/ijmds.v10n10.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在确定EIAR外部资助农业研究项目中最具挑战性的pmka。采用描述性研究设计的定性研究方法。采用了主要和次要数据收集方法。受访者是有目的地确定的。基于这种技术,确定了124名受访者。受访者在30个项目中工作。每个项目还组织了30名关键线人的受访者。收集的数据通过SPSS进行分析。问卷的Cronbach’s Alpha检验结果为0.85。结果表明,与组织环境、项目风险管理、项目时间管理、项目成本管理和项目质量管理相关的挑战是最具挑战性的知识领域,而其他pmka具有中等挑战性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessment study on the Challenges of Project Management Knowledge Areas
This study was conducted to identify the most challenging PMKAs in the external funded agricultural research projects of EIAR. The qualitative research approach with descriptive research designs was implemented. Both primary and secondary data collection methods were used. Respondents were purposively identified. Based on this technique 124 respondents were identified. Respondents were working in 30 projects. Interviewees were also organized for 30 key informants from each project. The collected data were analysed through SPSS. The Cronbach’s Alpha test result of the questionnaire is 0.85. The result shows that, challenges related with organizational environment, project risk management, project time management, project cost management, and project quality management are the most challenging knowledge areas whereas the other PMKAs are moderately challenging.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信