{"title":"马来西亚建筑保护投标中差异大的原因","authors":"Lim Yoke Mui, Y. Ahmad, F. Nabavi","doi":"10.1108/SS-04-2015-0023","DOIUrl":null,"url":null,"abstract":"Purpose – The purpose of this paper is to identify the reasons for the variance among tenders for conservation projects in Malaysia. Design/methodology/approach – Semi-structured interview approach was adopted because this method allows for effective probing of issues. The interviews are conducted with experienced conservation contractors. The interviews are transcribed and the data are analysed using thematic analysis. Coefficient of variation (CV) measure was also used to determine the level of variance that occurs in tenders for conservation projects. Findings – The study found that contractors faced difficulty in pricing competitively due to the following four factors, namely, uncertain information on the actual work on site, inexperience in conservation construction works, information in the bill of quantities is incomplete and uncertain labour and material cost. The study of 22 tenders also ascertains that there is a high variance among the tenderers for building conservation projects. This is deter...","PeriodicalId":118605,"journal":{"name":"Structural Survey","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Causes of high variance in building conservation tenders in Malaysia\",\"authors\":\"Lim Yoke Mui, Y. Ahmad, F. Nabavi\",\"doi\":\"10.1108/SS-04-2015-0023\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose – The purpose of this paper is to identify the reasons for the variance among tenders for conservation projects in Malaysia. Design/methodology/approach – Semi-structured interview approach was adopted because this method allows for effective probing of issues. The interviews are conducted with experienced conservation contractors. The interviews are transcribed and the data are analysed using thematic analysis. Coefficient of variation (CV) measure was also used to determine the level of variance that occurs in tenders for conservation projects. Findings – The study found that contractors faced difficulty in pricing competitively due to the following four factors, namely, uncertain information on the actual work on site, inexperience in conservation construction works, information in the bill of quantities is incomplete and uncertain labour and material cost. The study of 22 tenders also ascertains that there is a high variance among the tenderers for building conservation projects. This is deter...\",\"PeriodicalId\":118605,\"journal\":{\"name\":\"Structural Survey\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-04-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Structural Survey\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/SS-04-2015-0023\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Structural Survey","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/SS-04-2015-0023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Causes of high variance in building conservation tenders in Malaysia
Purpose – The purpose of this paper is to identify the reasons for the variance among tenders for conservation projects in Malaysia. Design/methodology/approach – Semi-structured interview approach was adopted because this method allows for effective probing of issues. The interviews are conducted with experienced conservation contractors. The interviews are transcribed and the data are analysed using thematic analysis. Coefficient of variation (CV) measure was also used to determine the level of variance that occurs in tenders for conservation projects. Findings – The study found that contractors faced difficulty in pricing competitively due to the following four factors, namely, uncertain information on the actual work on site, inexperience in conservation construction works, information in the bill of quantities is incomplete and uncertain labour and material cost. The study of 22 tenders also ascertains that there is a high variance among the tenderers for building conservation projects. This is deter...