{"title":"生产过程的状态图模型和启发式调度","authors":"P. Kurdel, J. Sebestyénová","doi":"10.1109/INES.2011.5954764","DOIUrl":null,"url":null,"abstract":"Modern factories often employ elaborate manufacturing information systems involving a computer network and various databases. In practice, it often happens that soon after a plan or schedule has been generated, an unexpected event happens that forces the decision-maker to make changes. We present a Statecharts model of a small manufacturing plant. Based on analysis of manufacturing processes in a project partner firm, we model it as discrete event system. Further we propose a heuristic rescheduling algorithm for it.","PeriodicalId":414812,"journal":{"name":"2011 15th IEEE International Conference on Intelligent Engineering Systems","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Statecharts model and heuristic scheduling of a production process\",\"authors\":\"P. Kurdel, J. Sebestyénová\",\"doi\":\"10.1109/INES.2011.5954764\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Modern factories often employ elaborate manufacturing information systems involving a computer network and various databases. In practice, it often happens that soon after a plan or schedule has been generated, an unexpected event happens that forces the decision-maker to make changes. We present a Statecharts model of a small manufacturing plant. Based on analysis of manufacturing processes in a project partner firm, we model it as discrete event system. Further we propose a heuristic rescheduling algorithm for it.\",\"PeriodicalId\":414812,\"journal\":{\"name\":\"2011 15th IEEE International Conference on Intelligent Engineering Systems\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-06-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 15th IEEE International Conference on Intelligent Engineering Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INES.2011.5954764\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 15th IEEE International Conference on Intelligent Engineering Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INES.2011.5954764","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Statecharts model and heuristic scheduling of a production process
Modern factories often employ elaborate manufacturing information systems involving a computer network and various databases. In practice, it often happens that soon after a plan or schedule has been generated, an unexpected event happens that forces the decision-maker to make changes. We present a Statecharts model of a small manufacturing plant. Based on analysis of manufacturing processes in a project partner firm, we model it as discrete event system. Further we propose a heuristic rescheduling algorithm for it.