Alexander Keller, J. Hellerstein, J. Wolf, Kun-Lung Wu, Vijaya Krishnan
{"title":"CHAMPS系统:通过计划和调度进行变更管理","authors":"Alexander Keller, J. Hellerstein, J. Wolf, Kun-Lung Wu, Vijaya Krishnan","doi":"10.1109/NOMS.2004.1317679","DOIUrl":null,"url":null,"abstract":"Change management is a process by which IT systems are modified to accommodate considerations such as software fixes, hardware upgrades and performance enhancements. This paper discusses the CHAMPS system, a prototype under development at IBM Research for Change Management with Planning and Scheduling. The CHAMPS system is able to achieve a very high degree of parallelism for a set of tasks by exploiting detailed factual knowledge about the structure of a distributed system from dependency information at runtime. In contrast, today's systems expect an administrator to provide such insights, which is often not the case. Furthermore, the optimization techniques we employ allow the CHAMPS system to come up with a very high quality solution for a mathematically intractable problem in a time which scales nicely with the problem size. We have implemented the CHAMPS system and have applied it in a TPC-W environment that implements an on-line book store application.","PeriodicalId":260367,"journal":{"name":"2004 IEEE/IFIP Network Operations and Management Symposium (IEEE Cat. No.04CH37507)","volume":"188 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-04-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"153","resultStr":"{\"title\":\"The CHAMPS system: change management with planning and scheduling\",\"authors\":\"Alexander Keller, J. Hellerstein, J. Wolf, Kun-Lung Wu, Vijaya Krishnan\",\"doi\":\"10.1109/NOMS.2004.1317679\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Change management is a process by which IT systems are modified to accommodate considerations such as software fixes, hardware upgrades and performance enhancements. This paper discusses the CHAMPS system, a prototype under development at IBM Research for Change Management with Planning and Scheduling. The CHAMPS system is able to achieve a very high degree of parallelism for a set of tasks by exploiting detailed factual knowledge about the structure of a distributed system from dependency information at runtime. In contrast, today's systems expect an administrator to provide such insights, which is often not the case. Furthermore, the optimization techniques we employ allow the CHAMPS system to come up with a very high quality solution for a mathematically intractable problem in a time which scales nicely with the problem size. We have implemented the CHAMPS system and have applied it in a TPC-W environment that implements an on-line book store application.\",\"PeriodicalId\":260367,\"journal\":{\"name\":\"2004 IEEE/IFIP Network Operations and Management Symposium (IEEE Cat. No.04CH37507)\",\"volume\":\"188 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-04-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"153\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2004 IEEE/IFIP Network Operations and Management Symposium (IEEE Cat. No.04CH37507)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NOMS.2004.1317679\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2004 IEEE/IFIP Network Operations and Management Symposium (IEEE Cat. No.04CH37507)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NOMS.2004.1317679","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The CHAMPS system: change management with planning and scheduling
Change management is a process by which IT systems are modified to accommodate considerations such as software fixes, hardware upgrades and performance enhancements. This paper discusses the CHAMPS system, a prototype under development at IBM Research for Change Management with Planning and Scheduling. The CHAMPS system is able to achieve a very high degree of parallelism for a set of tasks by exploiting detailed factual knowledge about the structure of a distributed system from dependency information at runtime. In contrast, today's systems expect an administrator to provide such insights, which is often not the case. Furthermore, the optimization techniques we employ allow the CHAMPS system to come up with a very high quality solution for a mathematically intractable problem in a time which scales nicely with the problem size. We have implemented the CHAMPS system and have applied it in a TPC-W environment that implements an on-line book store application.