{"title":"通信系统直流发电厂的现场可靠性","authors":"M. Grossoni, L. Rizzi","doi":"10.1109/INTLEC.1987.4794636","DOIUrl":null,"url":null,"abstract":"Field reliability data are described with references to 48V/60V 300A power plants, developed by ITALTEL according to specifications of SIP, Italian Telecommunication Operating Company. Each power plant consists of a power distribution system, 60A rectifiers and 25A buck-boost converters, redundant parallel operating with load sharing and selective cut-off of failed unit. The period under examination covers almost 4 years, during which over 200 power plants with more than 600 rectifiers and 700 buck-boost converters have been installed. The methods used for data collection are explained, as well as the statistical instruments used for the comparison of field results and estimated data.","PeriodicalId":129305,"journal":{"name":"INTELEC '87 - The Ninth International Telecommunications Energy Conference","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1987-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Field Reliability of D.C. Power Plants for Telecommunication Systems\",\"authors\":\"M. Grossoni, L. Rizzi\",\"doi\":\"10.1109/INTLEC.1987.4794636\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Field reliability data are described with references to 48V/60V 300A power plants, developed by ITALTEL according to specifications of SIP, Italian Telecommunication Operating Company. Each power plant consists of a power distribution system, 60A rectifiers and 25A buck-boost converters, redundant parallel operating with load sharing and selective cut-off of failed unit. The period under examination covers almost 4 years, during which over 200 power plants with more than 600 rectifiers and 700 buck-boost converters have been installed. The methods used for data collection are explained, as well as the statistical instruments used for the comparison of field results and estimated data.\",\"PeriodicalId\":129305,\"journal\":{\"name\":\"INTELEC '87 - The Ninth International Telecommunications Energy Conference\",\"volume\":\"34 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1987-06-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"INTELEC '87 - The Ninth International Telecommunications Energy Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INTLEC.1987.4794636\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTELEC '87 - The Ninth International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.1987.4794636","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Field Reliability of D.C. Power Plants for Telecommunication Systems
Field reliability data are described with references to 48V/60V 300A power plants, developed by ITALTEL according to specifications of SIP, Italian Telecommunication Operating Company. Each power plant consists of a power distribution system, 60A rectifiers and 25A buck-boost converters, redundant parallel operating with load sharing and selective cut-off of failed unit. The period under examination covers almost 4 years, during which over 200 power plants with more than 600 rectifiers and 700 buck-boost converters have been installed. The methods used for data collection are explained, as well as the statistical instruments used for the comparison of field results and estimated data.