ЭС2Г系列压缩机组运行初期可靠性分析

A. Vorob’ev, S.O. Zyazev
{"title":"ЭС2Г系列压缩机组运行初期可靠性分析","authors":"A. Vorob’ev, S.O. Zyazev","doi":"10.20291/2079-0392-2020-1-24-29","DOIUrl":null,"url":null,"abstract":"The article considers reliability analysis of compressor screw units on electric trains of ЭС2Г series on the basis of information received on operating time between failures from the beginning of operation. The combined recovery process and recovery function are plotted, and the fault flow function is calculated and constructed. Conclusions on the reliability of the considered equipment are drawn on the failure flow function. At the beginning of operation of these compressor units a number of failures occurred related to the run-in period. The manufacturer took into account all cases of incorrect operation and made changes in the design and electrical control circuits, which allowed reducing the probability of failures many times in the future. In the future, the present results can be usefully applied to calculate the distribution function and estimate the 90% resource.","PeriodicalId":118708,"journal":{"name":"Herald of the Ural State University of Railway Transport","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reliability analysis of ЭС2Г series compressor train units at the beginning of operation\",\"authors\":\"A. Vorob’ev, S.O. Zyazev\",\"doi\":\"10.20291/2079-0392-2020-1-24-29\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article considers reliability analysis of compressor screw units on electric trains of ЭС2Г series on the basis of information received on operating time between failures from the beginning of operation. The combined recovery process and recovery function are plotted, and the fault flow function is calculated and constructed. Conclusions on the reliability of the considered equipment are drawn on the failure flow function. At the beginning of operation of these compressor units a number of failures occurred related to the run-in period. The manufacturer took into account all cases of incorrect operation and made changes in the design and electrical control circuits, which allowed reducing the probability of failures many times in the future. In the future, the present results can be usefully applied to calculate the distribution function and estimate the 90% resource.\",\"PeriodicalId\":118708,\"journal\":{\"name\":\"Herald of the Ural State University of Railway Transport\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Herald of the Ural State University of Railway Transport\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.20291/2079-0392-2020-1-24-29\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Herald of the Ural State University of Railway Transport","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20291/2079-0392-2020-1-24-29","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文根据ЭС2Г系列电动列车从运行开始就接收到的故障间隔时间信息,对压缩机螺杆机组进行可靠性分析。绘制了组合恢复过程和恢复函数,计算并构造了断层流函数。根据故障流函数得出了所考虑设备可靠性的结论。在这些压缩机机组开始运行时,发生了许多与磨合期有关的故障。制造商考虑到所有不正确操作的情况,并对设计和电气控制电路进行了更改,这使得将来多次减少故障的可能性。在未来,本文的结果可以有效地用于计算分布函数和估计90%的资源。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reliability analysis of ЭС2Г series compressor train units at the beginning of operation
The article considers reliability analysis of compressor screw units on electric trains of ЭС2Г series on the basis of information received on operating time between failures from the beginning of operation. The combined recovery process and recovery function are plotted, and the fault flow function is calculated and constructed. Conclusions on the reliability of the considered equipment are drawn on the failure flow function. At the beginning of operation of these compressor units a number of failures occurred related to the run-in period. The manufacturer took into account all cases of incorrect operation and made changes in the design and electrical control circuits, which allowed reducing the probability of failures many times in the future. In the future, the present results can be usefully applied to calculate the distribution function and estimate the 90% resource.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信