{"title":"软件风险度量的财务工具","authors":"Masood Uzzafer","doi":"10.1109/ICISA.2010.5480537","DOIUrl":null,"url":null,"abstract":"Risk measurement of the software projects is presented based on analogies with financial risk measure models. Financial risk measure models assign a monetary value to a risk event to gauge the financial impact of the risk event on the financial investment. Estimated software cost is modeled as a financial investment and financial risk measure models are adopted to measure the monetary loss due to a risk event associated with the estimate cost of a software project. Further risk measure models are utilized for resource contingency planning needed to combat the worst case risk events.","PeriodicalId":313762,"journal":{"name":"2010 International Conference on Information Science and Applications","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-04-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"A Financial Tool for Software Risk Measurement\",\"authors\":\"Masood Uzzafer\",\"doi\":\"10.1109/ICISA.2010.5480537\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Risk measurement of the software projects is presented based on analogies with financial risk measure models. Financial risk measure models assign a monetary value to a risk event to gauge the financial impact of the risk event on the financial investment. Estimated software cost is modeled as a financial investment and financial risk measure models are adopted to measure the monetary loss due to a risk event associated with the estimate cost of a software project. Further risk measure models are utilized for resource contingency planning needed to combat the worst case risk events.\",\"PeriodicalId\":313762,\"journal\":{\"name\":\"2010 International Conference on Information Science and Applications\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-04-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on Information Science and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICISA.2010.5480537\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Information Science and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICISA.2010.5480537","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Risk measurement of the software projects is presented based on analogies with financial risk measure models. Financial risk measure models assign a monetary value to a risk event to gauge the financial impact of the risk event on the financial investment. Estimated software cost is modeled as a financial investment and financial risk measure models are adopted to measure the monetary loss due to a risk event associated with the estimate cost of a software project. Further risk measure models are utilized for resource contingency planning needed to combat the worst case risk events.