配电网维修预测工程

Vitaly V. Tishkov, T. Leshchinskaya, Mikhail M. Galkin, A. Alipichev
{"title":"配电网维修预测工程","authors":"Vitaly V. Tishkov, T. Leshchinskaya, Mikhail M. Galkin, A. Alipichev","doi":"10.1109/REEPE49198.2020.9059129","DOIUrl":null,"url":null,"abstract":"The paper outlines a concept of reducing economic losses resulting from damage in power grids when predicting future repair and renovation works. Increased economic losses caused by electric energy undersupply and the cost of emergency operations result in a steady increase in the unit cost of electric energy. The authors present an algorithm of the effective optimization of repair works carried out in power grids with a voltage of 6–10 kV. The main idea of the proposed algorithm is to introduce a multi-criteria evaluation system, which, in some respects, can be quite promising when applied in power grids of the Russian Federation. Based on the assessment made, the authors have worked out a phased repair plan of the most important and damageable power grid nodes, the failures of which may lead to considerable economic losses.","PeriodicalId":142369,"journal":{"name":"2020 International Youth Conference on Radio Electronics, Electrical and Power Engineering (REEPE)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Forecasting Repair Works in Power Distribution Grids\",\"authors\":\"Vitaly V. Tishkov, T. Leshchinskaya, Mikhail M. Galkin, A. Alipichev\",\"doi\":\"10.1109/REEPE49198.2020.9059129\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper outlines a concept of reducing economic losses resulting from damage in power grids when predicting future repair and renovation works. Increased economic losses caused by electric energy undersupply and the cost of emergency operations result in a steady increase in the unit cost of electric energy. The authors present an algorithm of the effective optimization of repair works carried out in power grids with a voltage of 6–10 kV. The main idea of the proposed algorithm is to introduce a multi-criteria evaluation system, which, in some respects, can be quite promising when applied in power grids of the Russian Federation. Based on the assessment made, the authors have worked out a phased repair plan of the most important and damageable power grid nodes, the failures of which may lead to considerable economic losses.\",\"PeriodicalId\":142369,\"journal\":{\"name\":\"2020 International Youth Conference on Radio Electronics, Electrical and Power Engineering (REEPE)\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 International Youth Conference on Radio Electronics, Electrical and Power Engineering (REEPE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/REEPE49198.2020.9059129\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Youth Conference on Radio Electronics, Electrical and Power Engineering (REEPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REEPE49198.2020.9059129","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文概述了在预测未来维修和改造工程时减少电网损坏造成的经济损失的概念。电力供应不足和紧急行动费用造成的经济损失增加,导致电力单位成本稳步上升。提出了一种6 ~ 10kv电压下电网维修工作的有效优化算法。所提出算法的主要思想是引入一种多准则评价系统,该系统在某些方面应用于俄罗斯联邦电网是很有希望的。在此基础上,针对电网中最重要、最易损坏的节点,制定了阶段性修复方案,这些节点一旦发生故障,可能会造成相当大的经济损失。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Forecasting Repair Works in Power Distribution Grids
The paper outlines a concept of reducing economic losses resulting from damage in power grids when predicting future repair and renovation works. Increased economic losses caused by electric energy undersupply and the cost of emergency operations result in a steady increase in the unit cost of electric energy. The authors present an algorithm of the effective optimization of repair works carried out in power grids with a voltage of 6–10 kV. The main idea of the proposed algorithm is to introduce a multi-criteria evaluation system, which, in some respects, can be quite promising when applied in power grids of the Russian Federation. Based on the assessment made, the authors have worked out a phased repair plan of the most important and damageable power grid nodes, the failures of which may lead to considerable economic losses.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信