在输电线路上部署移动断开开关的工作人员安全考虑

J. Khan, M. Armstrong, A. Moshref
{"title":"在输电线路上部署移动断开开关的工作人员安全考虑","authors":"J. Khan, M. Armstrong, A. Moshref","doi":"10.1109/CCECE47787.2020.9255735","DOIUrl":null,"url":null,"abstract":"Mobile disconnect switches allow electrical isolation on high voltage transmission lines where stationary switches are not available, or special switching is required. In particular, dropping/picking part of a line and loop switching are two key applications of mobile switches. These switches are used in live-line environment. Therefore, several worker safety considerations must be taken into account prior to their deployment. Electrical clearance, grounding design, switch duty calculation and switching sequence - all needs to be assessed. This article provides a set of simplified methods for initial calculations, and an example of real-world deployment where many of these issues are addressed.","PeriodicalId":296506,"journal":{"name":"2020 IEEE Canadian Conference on Electrical and Computer Engineering (CCECE)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Worker Safety Considerations for Deployment of Mobile Disconnect Switches on Transmission Lines\",\"authors\":\"J. Khan, M. Armstrong, A. Moshref\",\"doi\":\"10.1109/CCECE47787.2020.9255735\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Mobile disconnect switches allow electrical isolation on high voltage transmission lines where stationary switches are not available, or special switching is required. In particular, dropping/picking part of a line and loop switching are two key applications of mobile switches. These switches are used in live-line environment. Therefore, several worker safety considerations must be taken into account prior to their deployment. Electrical clearance, grounding design, switch duty calculation and switching sequence - all needs to be assessed. This article provides a set of simplified methods for initial calculations, and an example of real-world deployment where many of these issues are addressed.\",\"PeriodicalId\":296506,\"journal\":{\"name\":\"2020 IEEE Canadian Conference on Electrical and Computer Engineering (CCECE)\",\"volume\":\"19 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-08-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE Canadian Conference on Electrical and Computer Engineering (CCECE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CCECE47787.2020.9255735\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE Canadian Conference on Electrical and Computer Engineering (CCECE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CCECE47787.2020.9255735","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

移动断开开关允许在没有固定开关或需要特殊开关的高压输电线路上进行电气隔离。移动交换机的两个关键应用是丢/拣部分线路和环路交换。这些开关用于带电环境。因此,在部署之前必须考虑几个工人的安全问题。电气间隙,接地设计,开关负载计算和开关顺序-都需要评估。本文提供了一组用于初始计算的简化方法,并提供了一个实际部署示例,其中解决了许多此类问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Worker Safety Considerations for Deployment of Mobile Disconnect Switches on Transmission Lines
Mobile disconnect switches allow electrical isolation on high voltage transmission lines where stationary switches are not available, or special switching is required. In particular, dropping/picking part of a line and loop switching are two key applications of mobile switches. These switches are used in live-line environment. Therefore, several worker safety considerations must be taken into account prior to their deployment. Electrical clearance, grounding design, switch duty calculation and switching sequence - all needs to be assessed. This article provides a set of simplified methods for initial calculations, and an example of real-world deployment where many of these issues are addressed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信