在裸眼砾石充填完井的深水海上井中启动最强大的ESP:一个真正的挑战

C. Pedroso, B. Cavalcante, M. Marsili, M. Santos, P. Rocha
{"title":"在裸眼砾石充填完井的深水海上井中启动最强大的ESP:一个真正的挑战","authors":"C. Pedroso, B. Cavalcante, M. Marsili, M. Santos, P. Rocha","doi":"10.2118/194407-MS","DOIUrl":null,"url":null,"abstract":"\n Atlanta Field, offshore Brazil, is probably the most challenging deep-water heavy oil field in the world.\n Great challenges have been overcome to build and test the first two wells in this field which have already been detailed elsewhere (Papers OTC 25813, SPE 174893, SPE 174896, SPE 174897, SPE 173946). The refurbishment of the FPSO Petrojarl I, to enable it to process the high viscous oil will be described elsewhere. Finally, the last frontier to prove the technical and economic viability of Atlanta Project is the so called \"First Oil\" and the ESP operation.\n In normal conditions starting an offshore well when equipped with an ESP (Electrical Submersible Pump) is not a trivial task. Furthermore, Atlanta's wells lower completion is composed of Open Hole Horizontal Gravel Packs, due to the completely unconsolidated reservoir. To produce the viscous oil to the FPSO, the most powerful ESPs in the world, with 1,550 HP induction motors, were installed into the wells. Because of the low temperature on the seabed (around four degrees Celsius) in the event of any (expected or unexpected) plant or pump shutdowns, the viscosity of the cold oil could increase to up 100.000 cP in a few hours, despite the flowline insulation. Finally, managing the treatment plant start up procedure is a very complex task.\n All these conditions combined made the Atlanta Field Start Up a real challenge. A very restrictive procedure to increase the production drawdown, the production rates, the ESP demand and the plant processing capacities were successfully implemented.\n These extremely harsh conditions and the effective procedures to cope with them are thoroughly discussed in this paper.","PeriodicalId":334026,"journal":{"name":"Day 4 Thu, May 16, 2019","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Starting Up the Most Powerful ESP Installed into Deepwater Offshore Wells Completed with Open Hole Gravel Packing: A Real Challenge\",\"authors\":\"C. Pedroso, B. Cavalcante, M. Marsili, M. Santos, P. Rocha\",\"doi\":\"10.2118/194407-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Atlanta Field, offshore Brazil, is probably the most challenging deep-water heavy oil field in the world.\\n Great challenges have been overcome to build and test the first two wells in this field which have already been detailed elsewhere (Papers OTC 25813, SPE 174893, SPE 174896, SPE 174897, SPE 173946). The refurbishment of the FPSO Petrojarl I, to enable it to process the high viscous oil will be described elsewhere. Finally, the last frontier to prove the technical and economic viability of Atlanta Project is the so called \\\"First Oil\\\" and the ESP operation.\\n In normal conditions starting an offshore well when equipped with an ESP (Electrical Submersible Pump) is not a trivial task. Furthermore, Atlanta's wells lower completion is composed of Open Hole Horizontal Gravel Packs, due to the completely unconsolidated reservoir. To produce the viscous oil to the FPSO, the most powerful ESPs in the world, with 1,550 HP induction motors, were installed into the wells. Because of the low temperature on the seabed (around four degrees Celsius) in the event of any (expected or unexpected) plant or pump shutdowns, the viscosity of the cold oil could increase to up 100.000 cP in a few hours, despite the flowline insulation. Finally, managing the treatment plant start up procedure is a very complex task.\\n All these conditions combined made the Atlanta Field Start Up a real challenge. A very restrictive procedure to increase the production drawdown, the production rates, the ESP demand and the plant processing capacities were successfully implemented.\\n These extremely harsh conditions and the effective procedures to cope with them are thoroughly discussed in this paper.\",\"PeriodicalId\":334026,\"journal\":{\"name\":\"Day 4 Thu, May 16, 2019\",\"volume\":\"19 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, May 16, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/194407-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, May 16, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/194407-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

位于巴西近海的亚特兰大油田可能是世界上最具挑战性的深水重油油田。该油田的前两口井的建造和测试已经克服了巨大的挑战,这些挑战已经在其他地方详细介绍过(论文OTC 25813, SPE 174893, SPE 174896, SPE 174897, SPE 173946)。FPSO Petrojarl I的翻新,使其能够处理高粘性油,将在其他地方描述。最后,证明亚特兰大项目技术和经济可行性的最后一个领域是所谓的“First Oil”和ESP作业。在正常情况下,使用电潜泵启动海上油井并不是一件容易的事情。此外,由于储层完全未固结,亚特兰大的下部完井由裸眼水平砾石充填组成。为了将粘稠油输送到浮式生产装置,钻井中安装了世界上最强大的esp,配备了1550马力的感应电机。由于海底的低温(约4摄氏度),在任何(预期的或意外的)工厂或泵关闭的情况下,冷油的粘度可能在几个小时内增加到高达100,000 cP,尽管管道是绝缘的。最后,管理处理厂启动程序是一项非常复杂的任务。所有这些条件加在一起,使亚特兰大油田启动成为一个真正的挑战。成功地实施了一个非常严格的程序,以增加生产降程、生产率、ESP需求和工厂处理能力。本文对这些极端恶劣的条件以及应对这些条件的有效措施进行了深入的讨论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Starting Up the Most Powerful ESP Installed into Deepwater Offshore Wells Completed with Open Hole Gravel Packing: A Real Challenge
Atlanta Field, offshore Brazil, is probably the most challenging deep-water heavy oil field in the world. Great challenges have been overcome to build and test the first two wells in this field which have already been detailed elsewhere (Papers OTC 25813, SPE 174893, SPE 174896, SPE 174897, SPE 173946). The refurbishment of the FPSO Petrojarl I, to enable it to process the high viscous oil will be described elsewhere. Finally, the last frontier to prove the technical and economic viability of Atlanta Project is the so called "First Oil" and the ESP operation. In normal conditions starting an offshore well when equipped with an ESP (Electrical Submersible Pump) is not a trivial task. Furthermore, Atlanta's wells lower completion is composed of Open Hole Horizontal Gravel Packs, due to the completely unconsolidated reservoir. To produce the viscous oil to the FPSO, the most powerful ESPs in the world, with 1,550 HP induction motors, were installed into the wells. Because of the low temperature on the seabed (around four degrees Celsius) in the event of any (expected or unexpected) plant or pump shutdowns, the viscosity of the cold oil could increase to up 100.000 cP in a few hours, despite the flowline insulation. Finally, managing the treatment plant start up procedure is a very complex task. All these conditions combined made the Atlanta Field Start Up a real challenge. A very restrictive procedure to increase the production drawdown, the production rates, the ESP demand and the plant processing capacities were successfully implemented. These extremely harsh conditions and the effective procedures to cope with them are thoroughly discussed in this paper.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信