五层地下室工程分析中的系统动力学模型

Divy Wira Agusma, A. Husin
{"title":"五层地下室工程分析中的系统动力学模型","authors":"Divy Wira Agusma, A. Husin","doi":"10.31695/ijerat.2021.3705","DOIUrl":null,"url":null,"abstract":"In connection with the increase in construction and the level of urbanization that occurs in Indonesia, the construction of high-rise housing will be carried out to optimize narrow land in urban areas. By providing several facilities with the concept of high rise building in the basement area and building a layered basement, it is expected to optimize the available land for the development of high rise housing. This study determines the approach to rework analysis on a 5-layer basement with a Dynamic Model System simulation model that can provide superior estimates so as to produce scenarios to reduce rework costs. With this research update, it is estimated that the System Dynamic Model ensures that rework costs can be reduced on Basement 5 Layer work by 17.41 % of the initial rework cost","PeriodicalId":424923,"journal":{"name":"International Journal of Engineering Research and Advanced Technology","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"System Dynamic Model in Analyzing 5 Layers Basement Work\",\"authors\":\"Divy Wira Agusma, A. Husin\",\"doi\":\"10.31695/ijerat.2021.3705\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In connection with the increase in construction and the level of urbanization that occurs in Indonesia, the construction of high-rise housing will be carried out to optimize narrow land in urban areas. By providing several facilities with the concept of high rise building in the basement area and building a layered basement, it is expected to optimize the available land for the development of high rise housing. This study determines the approach to rework analysis on a 5-layer basement with a Dynamic Model System simulation model that can provide superior estimates so as to produce scenarios to reduce rework costs. With this research update, it is estimated that the System Dynamic Model ensures that rework costs can be reduced on Basement 5 Layer work by 17.41 % of the initial rework cost\",\"PeriodicalId\":424923,\"journal\":{\"name\":\"International Journal of Engineering Research and Advanced Technology\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Engineering Research and Advanced Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31695/ijerat.2021.3705\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering Research and Advanced Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31695/ijerat.2021.3705","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

结合印尼的建设和城市化水平的增加,将进行高层住宅的建设,以优化城市地区的狭窄土地。通过在地下区域提供一些具有高层建筑概念的设施,并建造一个分层的地下室,预计将优化用于高层住宅开发的可用土地。本研究利用动态模型系统仿真模型确定了在5层地基上进行返工分析的方法,该模型可以提供更好的估算,从而产生降低返工成本的场景。通过这一研究更新,估计系统动态模型可以确保在第5层工作的返工成本比初始返工成本降低17.41%
本文章由计算机程序翻译,如有差异,请以英文原文为准。
System Dynamic Model in Analyzing 5 Layers Basement Work
In connection with the increase in construction and the level of urbanization that occurs in Indonesia, the construction of high-rise housing will be carried out to optimize narrow land in urban areas. By providing several facilities with the concept of high rise building in the basement area and building a layered basement, it is expected to optimize the available land for the development of high rise housing. This study determines the approach to rework analysis on a 5-layer basement with a Dynamic Model System simulation model that can provide superior estimates so as to produce scenarios to reduce rework costs. With this research update, it is estimated that the System Dynamic Model ensures that rework costs can be reduced on Basement 5 Layer work by 17.41 % of the initial rework cost
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信