{"title":"阿联酋客户视角下施工现金流与风险s曲线发展方法及施工前期面积法分析","authors":"Ahmed Sadek","doi":"10.47941/jepm.658","DOIUrl":null,"url":null,"abstract":"Purpose – Understanding construction cash flow estimation is crucial for project success. Experts are concerned about project’s cash-flow and risk estimation and control. Latest construction studies concentrated on modelling and estimating construction costs and risks. \nMethodology – This article aims to approach pure quantitative mathematical modelling to develop the S-Curves (i.e., cash-flow and risks) and to develop the cash-flow simple area method. This research referred to the mathematical definitions of construction cash-flow and risks, integrating a clear systematic approach to develop the s-curves and to build the simple-area-method. \nFindings – This research paper reviled that construction cash-flow and risk s-curves can be developed at the preconstruction stage, mathematically, without the need for having cost historical data of similar completed projects. In addition, this article has provided a simple area method approach mathematically, for construction cash flow analysis, using the basic developed cash-flow s-curve and the actual cost data of, at least, 2 completed similar projects. The simple area method is proved effective to provide a better understanding of cash-flow behaviour of the analysed projects’ type. However, the s-curves development can be generalised to cover construction cost and risk simple s-curves, while the area method is restricted with the projects’ characteristics (i.e., type, size, location, etc.) used in developing the simple area. \nUnique contribution to theory, practice and policy – The significance of this study is to provide an S-Curve development approach for both cashflow and risk percentages from client perspective at the preconstruction stage, using solely the tender contract value. And to provide a simpler stochastic area method approach for project management professionals/researchers, who do not have large amount of historical similar projects’ cost data. Originality, theoretical-implications, practical-implications, and limitations are presented in the conclusion for future research.","PeriodicalId":293107,"journal":{"name":"Journal of Entrepreneurship and Project Management","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"CONSTRUCTION CASH FLOW AND RISK S-CURVES DEVELOPMENT APPROACH, AND AREA METHOD ANALYSIS AT THE PRECONSTRUCTION STAGE FROM CLIENT PERSPECTIVE IN THE UNITED ARAB EMIRATES\",\"authors\":\"Ahmed Sadek\",\"doi\":\"10.47941/jepm.658\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose – Understanding construction cash flow estimation is crucial for project success. Experts are concerned about project’s cash-flow and risk estimation and control. Latest construction studies concentrated on modelling and estimating construction costs and risks. \\nMethodology – This article aims to approach pure quantitative mathematical modelling to develop the S-Curves (i.e., cash-flow and risks) and to develop the cash-flow simple area method. This research referred to the mathematical definitions of construction cash-flow and risks, integrating a clear systematic approach to develop the s-curves and to build the simple-area-method. \\nFindings – This research paper reviled that construction cash-flow and risk s-curves can be developed at the preconstruction stage, mathematically, without the need for having cost historical data of similar completed projects. In addition, this article has provided a simple area method approach mathematically, for construction cash flow analysis, using the basic developed cash-flow s-curve and the actual cost data of, at least, 2 completed similar projects. The simple area method is proved effective to provide a better understanding of cash-flow behaviour of the analysed projects’ type. However, the s-curves development can be generalised to cover construction cost and risk simple s-curves, while the area method is restricted with the projects’ characteristics (i.e., type, size, location, etc.) used in developing the simple area. \\nUnique contribution to theory, practice and policy – The significance of this study is to provide an S-Curve development approach for both cashflow and risk percentages from client perspective at the preconstruction stage, using solely the tender contract value. And to provide a simpler stochastic area method approach for project management professionals/researchers, who do not have large amount of historical similar projects’ cost data. Originality, theoretical-implications, practical-implications, and limitations are presented in the conclusion for future research.\",\"PeriodicalId\":293107,\"journal\":{\"name\":\"Journal of Entrepreneurship and Project Management\",\"volume\":\"42 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Entrepreneurship and Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47941/jepm.658\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Entrepreneurship and Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47941/jepm.658","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目的-了解施工现金流估算是项目成功的关键。专家们关注的是项目的现金流和风险的估计与控制。最新的建筑研究集中在建模和估算建筑成本和风险。方法-本文旨在接近纯粹的定量数学模型来开发s曲线(即现金流和风险),并开发现金流简单面积法。本研究参考了建筑现金流和风险的数学定义,整合了一个清晰系统的方法来绘制s曲线,并建立了简单面积法。研究发现-本研究报告指出,施工现金流和风险s曲线可以在施工前阶段进行数学开发,而无需具有类似竣工项目的成本历史数据。此外,本文还在数学上提供了一种简单的面积法方法,利用基本开发的现金流s曲线和至少2个已完成的类似项目的实际成本数据,进行施工现金流分析。简单面积法被证明是有效的,可以更好地了解所分析项目类型的现金流量行为。然而,s曲线开发可以概括为涵盖建设成本和风险的简单s曲线,而面积法则受到开发简单区域时所使用的项目特征(即类型,大小,位置等)的限制。对理论、实践和政策的独特贡献——本研究的意义在于,仅使用投标合同价值,从客户的角度,为施工前阶段的现金流和风险百分比提供了s曲线发展方法。并为没有大量历史类似项目成本数据的项目管理专业人员/研究人员提供一种更简单的随机面积法方法。结语部分提出了研究的原创性、理论意义、实践意义和局限性,供未来研究参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
CONSTRUCTION CASH FLOW AND RISK S-CURVES DEVELOPMENT APPROACH, AND AREA METHOD ANALYSIS AT THE PRECONSTRUCTION STAGE FROM CLIENT PERSPECTIVE IN THE UNITED ARAB EMIRATES
Purpose – Understanding construction cash flow estimation is crucial for project success. Experts are concerned about project’s cash-flow and risk estimation and control. Latest construction studies concentrated on modelling and estimating construction costs and risks. Methodology – This article aims to approach pure quantitative mathematical modelling to develop the S-Curves (i.e., cash-flow and risks) and to develop the cash-flow simple area method. This research referred to the mathematical definitions of construction cash-flow and risks, integrating a clear systematic approach to develop the s-curves and to build the simple-area-method. Findings – This research paper reviled that construction cash-flow and risk s-curves can be developed at the preconstruction stage, mathematically, without the need for having cost historical data of similar completed projects. In addition, this article has provided a simple area method approach mathematically, for construction cash flow analysis, using the basic developed cash-flow s-curve and the actual cost data of, at least, 2 completed similar projects. The simple area method is proved effective to provide a better understanding of cash-flow behaviour of the analysed projects’ type. However, the s-curves development can be generalised to cover construction cost and risk simple s-curves, while the area method is restricted with the projects’ characteristics (i.e., type, size, location, etc.) used in developing the simple area. Unique contribution to theory, practice and policy – The significance of this study is to provide an S-Curve development approach for both cashflow and risk percentages from client perspective at the preconstruction stage, using solely the tender contract value. And to provide a simpler stochastic area method approach for project management professionals/researchers, who do not have large amount of historical similar projects’ cost data. Originality, theoretical-implications, practical-implications, and limitations are presented in the conclusion for future research.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信