{"title":"平衡中的IT项目变量:支持成本预测的贝叶斯方法","authors":"B. Dalmazo, A. L. R. D. Sousa, Weverton Cordeiro, Juliano Araujo Wickboldt, R. C. Lunardi, R. Santos, L. Gaspary, L. Granville, C. Bartolini, M. Hickey","doi":"10.1109/SBES.2011.37","DOIUrl":null,"url":null,"abstract":"In the context of Information Technology (IT) project management, it is commonly accepted that the costs associated with support actions are strongly influenced by the effort spent during their development and test phases. Despite the importance of systematically characterizing and understanding this relationship, little has been done in this realm mainly due to the lack of proper mechanisms for both sharing information between IT project phases and learning from past experiences. To tackle this issue, we present a Bayesian model to perform support cost predictions based on data from software development and test phases. In addition, we present a qualitative and quantitative analysis of the model, in order to demonstrate its effectiveness and efficiency, and also discuss its potentialities and limitations.","PeriodicalId":142932,"journal":{"name":"2011 25th Brazilian Symposium on Software Engineering","volume":"67 1-3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"IT Project Variables in the Balance: A Bayesian Approach to Prediction of Support Costs\",\"authors\":\"B. Dalmazo, A. L. R. D. Sousa, Weverton Cordeiro, Juliano Araujo Wickboldt, R. C. Lunardi, R. Santos, L. Gaspary, L. Granville, C. Bartolini, M. Hickey\",\"doi\":\"10.1109/SBES.2011.37\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the context of Information Technology (IT) project management, it is commonly accepted that the costs associated with support actions are strongly influenced by the effort spent during their development and test phases. Despite the importance of systematically characterizing and understanding this relationship, little has been done in this realm mainly due to the lack of proper mechanisms for both sharing information between IT project phases and learning from past experiences. To tackle this issue, we present a Bayesian model to perform support cost predictions based on data from software development and test phases. In addition, we present a qualitative and quantitative analysis of the model, in order to demonstrate its effectiveness and efficiency, and also discuss its potentialities and limitations.\",\"PeriodicalId\":142932,\"journal\":{\"name\":\"2011 25th Brazilian Symposium on Software Engineering\",\"volume\":\"67 1-3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-09-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 25th Brazilian Symposium on Software Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SBES.2011.37\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 25th Brazilian Symposium on Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SBES.2011.37","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

在信息技术(IT)项目管理的上下文中,人们普遍认为,与支持活动相关的成本受到开发和测试阶段所花费的工作的强烈影响。尽管系统地描述和理解这种关系很重要,但由于缺乏在IT项目阶段之间共享信息和从过去的经验中学习的适当机制,在这一领域所做的工作很少。为了解决这个问题,我们提出了一个贝叶斯模型来执行基于软件开发和测试阶段数据的支持成本预测。此外,我们还对该模型进行了定性和定量分析,以证明其有效性和效率,并讨论了其潜力和局限性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
IT Project Variables in the Balance: A Bayesian Approach to Prediction of Support Costs
In the context of Information Technology (IT) project management, it is commonly accepted that the costs associated with support actions are strongly influenced by the effort spent during their development and test phases. Despite the importance of systematically characterizing and understanding this relationship, little has been done in this realm mainly due to the lack of proper mechanisms for both sharing information between IT project phases and learning from past experiences. To tackle this issue, we present a Bayesian model to perform support cost predictions based on data from software development and test phases. In addition, we present a qualitative and quantitative analysis of the model, in order to demonstrate its effectiveness and efficiency, and also discuss its potentialities and limitations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信