B. Dalmazo, A. L. R. D. Sousa, Weverton Cordeiro, Juliano Araujo Wickboldt, R. C. Lunardi, R. Santos, L. Gaspary, L. Granville, C. Bartolini, M. Hickey
{"title":"平衡中的IT项目变量:支持成本预测的贝叶斯方法","authors":"B. Dalmazo, A. L. R. D. Sousa, Weverton Cordeiro, Juliano Araujo Wickboldt, R. C. Lunardi, R. Santos, L. Gaspary, L. Granville, C. Bartolini, M. Hickey","doi":"10.1109/SBES.2011.37","DOIUrl":null,"url":null,"abstract":"In the context of Information Technology (IT) project management, it is commonly accepted that the costs associated with support actions are strongly influenced by the effort spent during their development and test phases. Despite the importance of systematically characterizing and understanding this relationship, little has been done in this realm mainly due to the lack of proper mechanisms for both sharing information between IT project phases and learning from past experiences. To tackle this issue, we present a Bayesian model to perform support cost predictions based on data from software development and test phases. In addition, we present a qualitative and quantitative analysis of the model, in order to demonstrate its effectiveness and efficiency, and also discuss its potentialities and limitations.","PeriodicalId":142932,"journal":{"name":"2011 25th Brazilian Symposium on Software Engineering","volume":"67 1-3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"IT Project Variables in the Balance: A Bayesian Approach to Prediction of Support Costs\",\"authors\":\"B. Dalmazo, A. L. R. D. Sousa, Weverton Cordeiro, Juliano Araujo Wickboldt, R. C. Lunardi, R. Santos, L. Gaspary, L. Granville, C. Bartolini, M. Hickey\",\"doi\":\"10.1109/SBES.2011.37\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the context of Information Technology (IT) project management, it is commonly accepted that the costs associated with support actions are strongly influenced by the effort spent during their development and test phases. Despite the importance of systematically characterizing and understanding this relationship, little has been done in this realm mainly due to the lack of proper mechanisms for both sharing information between IT project phases and learning from past experiences. To tackle this issue, we present a Bayesian model to perform support cost predictions based on data from software development and test phases. In addition, we present a qualitative and quantitative analysis of the model, in order to demonstrate its effectiveness and efficiency, and also discuss its potentialities and limitations.\",\"PeriodicalId\":142932,\"journal\":{\"name\":\"2011 25th Brazilian Symposium on Software Engineering\",\"volume\":\"67 1-3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-09-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 25th Brazilian Symposium on Software Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SBES.2011.37\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 25th Brazilian Symposium on Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SBES.2011.37","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
IT Project Variables in the Balance: A Bayesian Approach to Prediction of Support Costs
In the context of Information Technology (IT) project management, it is commonly accepted that the costs associated with support actions are strongly influenced by the effort spent during their development and test phases. Despite the importance of systematically characterizing and understanding this relationship, little has been done in this realm mainly due to the lack of proper mechanisms for both sharing information between IT project phases and learning from past experiences. To tackle this issue, we present a Bayesian model to perform support cost predictions based on data from software development and test phases. In addition, we present a qualitative and quantitative analysis of the model, in order to demonstrate its effectiveness and efficiency, and also discuss its potentialities and limitations.